Jason International, Inc. •
501.771.4477
Page 7 of 18
Customer Service : 800.255.5766
Copyright © 2011 Jason International.
instALLAtiOn instRuctiOns (cont.)
feature. During installation, the control box bracket and
controls must be positioned horizontally and located to
permit access for inspection and servicing. The MicroSilk
pump’s power cord will need to be plugged into the control
box. Connect the pump’s male J+J plug to the female
J+J plug of the control box’s load line. The MicroSilk and
blower junction box must be plugged into a dedicated 240v
20A, 50 or 60 Hz, GFCI protected circuit.
(See Figure 9A)
DANGeR: Do not alter the factory installed wiring. All building
materials and wiring should be routed away from the equipment
or other heat-producing components of the unit.
Figure 9
Figure 9A
NOTe: The load neutral terminal is not
used. There should be no connection
to the load neutral terminal on the GFCI
circuit breaker. The green wire (GND-
GReeN) is the equipment ground and
should be connected to the neutral bus
found in the main breaker box.
L2-WHITE WITH
RED MARK
L1-BLACK
GND-GREEN
FROM BLOWER CONTROL
FROM MICROSILK CONTROL
L2
240 V
L1
NO CONNECTION
(LOAD NEUTRAL)
BREAKER BOX
Note: The load neutral terminal is not used. There should be no connection to the load neutral
terminal on the GFCI circuit breaker. The green wire (GND-GREEN) is the equipment ground
and should be connected to the neutral bus found in the main breaker box.
BREAKER BOX CONNECTIONS