INSTALLATION 

 

1.  Finish Frame 

 

A finish frame under the shell rim should always be 
constructed to support the bath deck and ensure 
proper drainage toward the bath well.  This frame is not 
intended to support the full bath weight. See 

Figures 1 

and 2. 

Allow ample clearance for any equipment that 

may installed on the bath.  

 

CAUTION: Ambient temperature under the bath where 
equipment is installed must not exceed 122°F (50°C). 

 

Drop In Framing 

The drop in opening should approximately one (1) inch 
[2.5cm] less than the outer dimensions of the bath.  
Full size templates are included with the bath 
packaging for oval tubs. 
 

 

Figure 1 

Alcove Framing 

For 3-

wall alcove installations, install a 1”x 2” ledger 

strip to support the tile lip flange.  See the 

Integral Tile 

Lip Alcove Installation

 section for further instructions. 

 

 

Figure 2

 

 

 

2. AirMasseur

®

 Ventilation (AM baths) 

A minimum ventilation opening of 2” x 4” [5x10cm] for 
the AirMasseur blower is required.  It should be 
designed to draw in indoor ambient air at a minimum of 
72°F [22°C]. 
 

3. Drain and Overflow 

Install the drain and overflow assembly to the bath shell 
according to the instructions provided with the drain and 
position the bath in the area of intended installation.  
Finish plumbing rough-in of drain and overflow 
assembly.  At this time, considerations should be made 
for the position and mounting of the faucet set, as well 
as all related plumbing. 
 

4. Level Installation 

To ensure proper operation, the bath must be leveled 
by the rim of the tub.  The full length of the bath bottom 
should be supported by a mortar bed or other bedding 
compound.  Spread a 2” [5cm] thick layer of mortar on 
the subfloor where the bath will be installed to help 
secure, level and support the bath.  A plastic sheet 
barrier can be placed on top and underneath the mortar 
bed. 
 
Set the bath in the mortar bed. Shift the bath from side 
to side to settle into the mortar bed. The tub will not 
drain properly if the bath is not level both front to back 
and side to side. Caution should be taken to prevent 
damage to any plumbing or other options when 
installing the bath.  Let the mortar harden overnight 
before use. 
 
Failure to properly bed and install the bath will void any 
warranty on the tub shell. 

 

Note:

 Do not use isolation pads or a sand bed to install 

or level the bath. 

 

 

Figure 3

 

INSTALLATION INSTRUCTIONS

 

Summary of Contents for Excel Series

Page 1: ...installation Damage to the unit during installation will not be covered by warranty and is the responsibility of the installer ALL WARRANTY CLAIMS ON ACRYLIC SURFACE DAMAGE MUST BE MADE PRIOR TO INST...

Page 2: ...ol anticoagulants stimulants antihistamines vasoconstrictors vasodilators hypnotics narcotics or tranquilizers F Lower water temperatures are recommended for extended use exceeding 10 15 minutes and f...

Page 3: ...s de 10 15 minutes et pour les jeunes enfants F Puisque les temp ratures excessives ont un potentiel lev pour les f tus durant les premiers mois de la grossesse les femmes enceintes ou possiblement en...

Page 4: ...fore servicing For baths requiring two circuits CAUTION Not Suitable for Field Installed Heater ATTENTION la temperature ambiante sous la baignoire o l quipement est install ne doit pas d passer 50 C...

Page 5: ...her used as a hydrotherapy bath soaking bath or just taking a shower NOTE If the unit fails to operate check the breaker panel to ensure that the circuit breaker is on Check the GFCI by testing and re...

Page 6: ...llowing procedures should be followed Note Do no remote mount the blower more than 15 feet 4 5m away from the air inlet of the bath Choose a location as close as possible to the bath to ensure maximum...

Page 7: ...ghly after cleaning SURFACE MAINTENANCE Area with minor scratches or dull surfaces can be restored by applying commercially available plastic polish i e Novus Plastic Polish No 2 available at your Jas...

Page 8: ...um of 72 F 22 C 3 Drain and Overflow Install the drain and overflow assembly to the bath shell according to the instructions provided with the drain and position the bath in the area of intended insta...

Page 9: ...ce of this bath has been provided with a protective film which helps protect the bath during shipment and installation If the bath is tiled in remove the necessary portion of the film when installing...

Page 10: ...and not interrupted by a switch Never use a switch in conjunction with a control device This will VOID THE MANUFACTURER S WARRANTY The pumps are supplied with an electrical bonding lug to allow connec...

Page 11: ...If no voltage control is defective b Motor is not plugged into control box b Make sure plug is fully inserted into the control box outlet c Air switch Plastic air tubing disconnected or broken c Check...

Page 12: ...nt of equipment shall be F O B point of shipment This warranty shall not apply to any merchandise which has been subject to accident alteration abuse misuse abrasives corrosion and or electrolysis imp...

Reviews: