8.  After the finished floor is installed, position the installation 

template on the finished floor.  Place the template to line up 

with the existing floor drain location and orient the template 

to the desired position.  

NOTe:

 Sump area location cutout; 

remote blower tubing floor location cutout; and water inlet  

stubout location must line up with the template.  Transfer the 

centerlines of the template to the finished floor. 

(CauTION:

 

use a marker that can be removed from the finished floor 

after installation).  Tape the template to the finished floor 

using care to align both centerlines and assure that the 

template is laying flat on the floor.  

9.  Drill the 1/4” pilot holes for the two indicated centerline 

mounting holes if installing on a wooden floor.  5/16” holes 

are required for a cement slab floor. 

(See Figure 3.)

10.Dry  fit  the  drain  and  overflow  to  the  bath.    Use  the 

instructions  included  with  the  drain  and  overflow  to 

determine the proper fit to the bath.  

NOTe:

 It is recommended 

that the Geberit drain and overflow model #150.176 be used.  If 

any other drain is used, it may not conform to these instructions.

  

(Drain Not Included.) This drain can be purchased from 

Figure 3

any authorized Jason International, Inc. dealer.  Position 

the bath in place and attach the drain and overflow to 

the floor drain “P” trap.  

(CauTION:

 Only dry fit the drain 

and overflow tee to the “P” trap at this time).  Disconnect 

the drain and overflow from the bath and leave the drain 

assembly free standing in the “P” trap.  

11.Align the drain with the centerline on the template. 

(see 

Figure 4.)

  

12.Permanently attach the drain tee to the “P” trap.  

13.Remove the template from the floor.

14.Place the bath skirt into position and attach to the floor by 

aligning the two (2) center-line holes in the bottom of the 

skirt with the pre-drilled holes in the floor.  Attach to the 

floor with a 5/16” x 2-1/2” lag screw and a 5/16” x 1-1/2” 

fender washer when installing into a wood floor or 5/16” 

concrete anchors and a 5/16” x 1-1/2” fender washer when 

installing into a concrete slab floor. 

(Fasteners not included.) 

CAUTION: Do not over tighten

.  

Figure 4

INSTALLATION INSTRUCTIONS (cont.)

Summary of Contents for Forma AirMasseur AC635P

Page 1: ...llation will not be covered by warranty and is the responsibility of the installer ALL WARRANTY CLAIMS ON ACRYLIC SURFACE DAMAGE 49 1000 113 Date 11 07 MUST BE MADE PRIOR TO INSTALLATION Inspect plumbing and bath surface for missing or damaged components Alert your dealer of any discrepancies To protect the unit from damage keep the unit in its carton until ready for installation EQUIPMENT ACCESS ...

Page 2: ...ed according to the instructions herein 5 Aninstallationtemplateisprovidedtolocatethefloordrain location sump area location remote blower tubing floor cutout location water inlet stub out location mounting holes and skirt center lines Tape the template to the sub floor in its desired location 6 Mark on the sub floor the sump area location the water inlet stub out location and the remote blower tub...

Page 3: ...netheproperfittothebath NOTE Itisrecommended that the Geberit drain and overflow model 150 176 be used If any other drain is used it may not conform to these instructions Drain Not Included This drain can be purchased from Figure 3 any authorized Jason International Inc dealer Position the bath in place and attach the drain and overflow to the floor drain P trap CAUTION Only dry fit the drain and ...

Page 4: ...OTE MOUNTING of air blower Do not remote mount the blower and control box more than 15 feet away from the air inlet of the bath Choose a location as close as possible to the bath to assure maximum efficiency 1 The installer is to determine the layout of the piping exact remote mount location and service access before beginning any work Use1 5 ABSorPVCplastictubing Locatethecontrolbox with the blow...

Page 5: ... Instructions section on page 11 or 12 for testing Faucetry connections should also be tested for leaks at this time 9 Remove the 2 x 4 boards and lower the bath into the skirt WARNING When you lower the bath into the skirt do not allow the hose sections to bind Align the drain and overflow with the corresponding bath holes and the bath brackets with the pre drilled holes in the skirt See Figure 8...

Page 6: ...edwiththeuseofawood edge trowel Paint or tar stains may need to be removed with a cleaner such as paint thinner turpentine or isopropyl alcohol rubbing alcohol Never allow the cleaner to soak against the surface for long periods of time Always rinse the surface immediately following the use of cleaners NOTE Follow the manufacturers instructions for safely using these or similar products If the sur...

Page 7: ... 6 ABOVE SUB FLOOR A licensed electrician must provide the dedicated electrical service protected by a GFCI The location of the GFCI must be at least five 5 feet away from the inside surface of the bath and accessible for regular testing Use copper conductors only DANGER RISK OF ELECTRIC SHOCK Connect only to a circuit protected by a Ground Fault Circuit Interrupter GFCI In the unlikely occurrence...

Page 8: ...bath from bacteria viruses etc while leaving the plumbing lines clean and fresh The ozone system works automatically in conjunction with the blower motor TOUCHPAD FEATURES A main control touchpad mounted on the bath deck features an LCD readout which alternately indicates the water temperature 5 F and air bath time remaining The touchpad operates all functions of the blower as well as the LED Mood...

Page 9: ...th industry The blower control box must be properly connected for the bath to function correctly THE BLOWER CONTROL BOX The blower keypad LED light ozone sanitation unit and temperature sensor must be plugged into the proper receptacles for correct operation of the AirMasseur system See Figure 12 for connections A The junction box for the blower control box must be connected into a 240v 15 amp GFC...

Page 10: ...and the bath is completely drained the blower will start again for a 2 minute purge cycle that dries the air channel Note that the LCD display will read PURGE and begin to countdown the 10 or 20 minute pause before the purge cycle begins The readout will display PURGE ON during the purge cycle Any time during the pause before the purge cycle begins pressing and holding the Blower Speeds icon will ...

Page 11: ...by a slow flashing light Pressing the icon again will change the blower to Pulse mode This is indicated by a rapid light flash Pressing the icon a third time moves the blower back to Constant mode Blower Speeds Icon The Blower Speeds icon is used to increase or decrease the blower speed once the blower is on Press and hold the icon to decrease the blower speed until the desired inten sity is reach...

Page 12: ...his function has a 2 hour timer and remembers the last mode The LCD displays Light On or Light Off while the key is pressed for less than 2 seconds Light Cycle is displayed if pressed for more than 2 seconds OPTION ICON This key is reserved for future options CUSTOMIZED SETTINGS The12characterLCDdisplaycanbecustomizedbypressing the Blower and Blower Speeds icons simultaneously for 5 seconds while ...

Page 13: ...olution i e glass cleaner and a soft wet cloth or sponge Do not run the air system with foaming cleaners or soaps Rinse the bath thoroughly after cleaning SURFACE MAINTENANCE Areas with minor scratches or dull surfaces can be restored by applying commercially available plastic polish i e Novus Plastic Polish No 2 available at your Jason dealer followed by an application of acrylic paste wax Buff t...

Page 14: ...fuses and replace if bad b Make sure plug is fully inserted into the outlet c Check and reconnect if necessary Blower shut off by itself or before time elapses a Blower motor overheated and thermal protection device deactivated motor possibly low voltage b GFCI tripped a Check that blower has sufficient ventillation and that the intake into the blower is not blocked Clear and allow the motor to co...

Page 15: ...ng Never use the therapy bath while under the influence of alcohol anticoagulants stimulants antihis tamines vasoconstrictors vasodilators hypnotics narcotics or tranquilizers F Persons with a medical history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a physician before using a therapy bath G Persons using medication should consult a physicia...

Reviews: