13.
Position the skirt
(only) and align it with the centerlines on
the finished floor. Use the four existing 3/8” holes located
in the bottom four corners of the skirt
to mark where to
drill the pilot holes for the four locating studs. If installing
on a wooden floor, 1/4” [6mm] holes are required, and a
5/16” nut to install the locating studs into the wooden floor.
When installing on a cement slab, 3/8” [9.5mm] holes are
required.
see figure 3.
After marking the hole locations,
remove the skirt and set aside.
14.
Dry fit the drain and overflow to the bath.
a. Dry fit the drain and overflow to the bath. Use the
instructions included with the drain and overflow to
determine proper fit. It is recommended that
flex
PVC
pipe be used between the overflow and drain. This will
assure there is enough clearance between the bath
shell and the skirt for the drain.
b. Position bath in place and attach the drain and overflow
to the floor drain “P” trap.
CauTIOn:
Only dry fit
the drain and overflow tee to the “P” trap at this
time.
figure 2
figure 4
c. Disconnect the drain and overflow from the bath and
leave the drain assembly free standing in the “P”
trap.
15.
align the drain with the center line on the template.
Refer to
figure 4.
16.
Permanently attach the drain tee to the “P” trap.
17.
remove the template from the floor.
18.
Install the skirt locating studs
into the four positions in the
floor. See
figure 5
.
19.
attach faucet accessories
to the bath (if applicable).
CauTIOn:
There is not enough room to mount a deck
mounted diverter valve on the deck of the bath.
If a hand-held shower is desired consider a floor mounted
faucet or a faucet with an above deck diverter.
If a floor mounted faucet is desired, be sure to install
the faucet to allow for sufficient overhang into the well
of the bath. This will ensure an unobstructed water flow
out of the faucet when filling the bath. Follow the faucet
manufacturers installation instructions.
20.
flex plumbing.
Attach stainless steel flex plumbing to the
figure 5
INSTALLATION INSTRUCTIONS (cont.)
1 38 "
1 38 "
Cutout C
Cutout A
Cutout B
Cutout B
Cutout A
Cutout B
Floor Drain
Location
Bath Drain
(Ref Only)
Bath Drain
(Ref Only)
Sump Area
Location
(for
RE630PS
Only)
Sump Area
Location
(for
RC630PS
Only)
Water Inlet
Stub-Out
Location
Water Inlet
Stub-Out
Location
Floor Drain
Location
Remote Blower
Tubing Floor
Cutout Location
Skirt
Template
Locating Stud
Pilotholes (x4)
3/8" Holes (x4)
8"
6"
Locating Stud Bolts (x4)
Remote Blower
Tubing Floor
Location
Water Inlet
Stub-Out
Location
Stub-Out (x2)
Sump Area
Location
Drain
Overflow
(PVC Flex Pipe)
Overflow
Floor