Jason International, Inc. •
501.771.4477
Page 4 of 9
Customer Service : 800.255.5766
Jason International, Inc. •
501.771.4477
Page 5 of 9
Customer Service : 800.255.5766
Copyright © 2011 Jason International.
InsTallaTIOn InsTruCTIOns (cont.)
actuator. A small bead of silicone may be added to the
air tubing connections to help prevent the tubing from
disengaging.The air switch tubing must also be installed
to allow for a “drop loop” see
figure 3
. This will prevent
any moisture from entering the air switch control box from
the tubing. Finally, the blower will plug into the control
box.
4.
Control box.
The blower is pre-wired with a 36” cord with a
NEMA plug end. The air switch control box and tubing is
temporarily secured to the bath’s plumbing for shipping.
During installation the tubing must be attached to the bath’s
air switch actuator and the air switch control box. The air
switch control box should be relocated to its dedicated
circuit outlet. Connect only to a dedicated Ground Fault
Circuit Interrupter (GFCI) protected, 120v (volt), 15A (amp),
60Hz (hertz) circuit with a service ground.
INSTALL SERVICE CONNECTION AT LEAST 6” ABOVE
THE SUB FLOOR
.
The air switch control box is intended
to be installed in a dry area and is for indoor use only.
DaNgER:
Do not alter the factory installed wiring.
All building
materials and wiring should be routed away from the
blower body or other heat-producing
all lOCal aND StatE ElECtRICal aND PlumbINg CODES muSt
bE ObSERVED.
Where there are no local codes the
National
Electric Code (NEC)
and
uniform Plumbing Code (uPC)
shall be
observed. It is the responsibility of the installer/owner to
determine specific code compliance prior to installation of
the product.
NOtE:
In the Commonwealth of Massachusetts, installation
is to be done by a Massachusetts licensed plumber.
CleanIng
Remove all loose debris.
3.
Construction plaster or
excess grout can be removed with the use of a wood
(edge) trowel.
paint or tar stains
4.
may need to be removed with a
cleaner such as paint thinner, turpentine, or isopropyl
alcohol (rubbing alcohol). Never allow the cleaner to
soak against the acrylic surface for long periods of time.
Always rinse the surface immediately following the use
of cleaners.
Follow the manufacturer’s instructions for safe use of
5.
cleaning products. If the surface becomes scratched
or dulled, it may be restored by using a quality plastic
polish, like Novus Plastic Polish No. 2 (available from
the Jason Dealer).
It is always preferable to protect
the acrylic surface during installation to minimize
cleanup and prevent surface damage.
waTer TesTIng
Before finishing the installation, it is recommended that the
bath be water tested and the plumbing tested for leaks.
before water testing the bath,
1.
make sure any pump
unions are hand tight. Do not over tighten or use a pipe
wrench. This will damage the unions and cause leaking.
If the unit leaks with the unions hand tight, then loosen
the unions(s) and check the O-ring seal to ensure it is
properly seated.
Fill and operate the bath.
2.
Close the drain and fill the
bath with water to at least 10 inches [25 cm] below the
bath deck. The inlet temperature should not exceed 104°F
(40°C) as this could damage the acrylic surface. Refer
to the
FIllING AND DRAINING
section of this owner’s
manual for more information.
Inspect the plumbing for leaks.
3.
Turn the equipment Off and then drain the water.
4.
The bath unit and its plumbing are designed to drain
after each use whether used as a hydrotherapy bath,
soaking bath, or when taking a shower
.