background image

Jason International, Inc.  •  

 

501.771.4477  

 

 

 

Page 3 of 5

  

 

 

Customer Service :  800.255.5766 

CLEANING

1. 

remove all loose debris.

  Construction plaster or excess grout 

can be removed with the use of a wooden-edged trowel.

2. 

Paint  or  tar  stains

  can  be  removed  with  paint  thinner, 

turpentine, or isopropyl alcohol (rubbing alcohol). Never 

allow the cleaner to soak against the acrylic surface for 

long periods of time.  

always rinse the surface immediately

 

following the use of cleaners. 

 

NOTe:  

Follow the manufacturers instructions for safe use 

of cleaning products. If the surface becomes scratched 

or  dulled,  it  may  be  restored  by  using  a  quality  plastic 

polish,  like  Novus  Plastic  Polish  No.  2  (available  from 

the  Jason  Dealer). 

 

It  is  always  preferable  to  protect  the 

acrylic  surface  during  installation  to  minimize  cleanup  and  

prevent surface damage.

Figure 1

BaTh wITh INTeGral TIle FlaNGe

SILICO NE BEAD

TILE

DRYW ALL

DRYW ALL

TILE

  O PTIO NAL

TILE FLANG E

        KIT  

  O PTIO NAL

INTEG RATED

    TILE LIP

   1" X 2"

[5 X 10 cm ]

SUPPO RT

FIG . 2

SCREW

Figure 2

Installation Instructions (cont.)

WATER TESTING

Before 

finishing the installation, it is recommended that the 

bath and plumbing tested for leaks. 

1. 

Fill and operate the bath.

  

Close the drain and fi

ll the bath 

with at least two (2) inches of water. The incoming water 

temperature should not exceed 104°F (40°C). 

2. 

Inspect the plumbing for leaks.

 

Reviews: