background image

© 2018 Jason

®

 Hydrotherapy  • tech@jasonhydrotherapy.com

Page 8 of 16

Customer Service :  800.255.5766

INSTALLATION INSTRUCTIONS

INSTALLATION

1. Finish Frame

A fi nish frame under the shell rim should always be 
constructed to support the bath deck and ensure proper 
drainage toward the bath well.  This frame is not intended 

to support the full bath weight. See 

Figures 1 and 

2

. Allow ample clearance for any equipment that may 

installed on the bath. 

CAUTION: Ambient temperature under the 
bath where equipment is installed must not 
exceed 122°F (50°C).
Drop In Framing

The drop in opening should be approximately one (1) inch 
[2.5cm] less than the outer dimensions of the bath.  Full 
size templates are included with the bath packaging for 
oval tubs.

Figure 1 

 

Alcove Framing

For 3-wall alcove installations, install a 1”x 2” ledger strip 
to support the tile lip fl ange.  See the 

Integral Tile Lip 

Alcove Installation

 section for further instructions.

Figure 2 

2. AirMasseur

®

 Ventilation (AM baths)

A minimum ventilation opening of 2” x 4” [5x10cm] for the 
AirMasseur blower is required.  It should be designed to 
draw in indoor ambient air at a minimum of 72°F [22°C].

3. Drain and Overflow

Install the drain and overfl ow assembly to the bath shell 
according to the instructions provided with the drain and 
position the bath in the area of intended installation.  Finish 
plumbing rough-in of drain and overfl ow assembly.  At this 
time, considerations should be made for the position and 
mounting of the faucet set, as well as all related plumbing.

4. Packing Board Removal

The bath is equipped with separate bath equipment sup-
port bases which are joined for shipment with packing 
boards.  Before installing the bath, detach the packing 
board from the bath and from underneath the equipment. 

WARNING: Any modification to the equip-
ment is not recommended and will void the 
Manufacturer’s warranty.

5. Level Installation

The bath must be installed level to ensure proper draining. 
To verify, use a level on top of the deck on both ends and 
front of the bath. Jason baths are designed to be supported 
at the base of the bath.  If the fl oor is smooth and level, the 
bath’s Level Form™ Base will provide proper drainage and 
support (see Figure 3).

Mortar is required when the subfl oor is not smooth and 
level or when additional sound insulation is desired.  

Note:

 Do not use a sand bed to install or level the bath.

Figure 3

BATH LIP SUPPORT

ACCESS OPENING

[IF REQUIRED]

WALL STUDS

FLANGE SUPPORT

Full Support Base

Summary of Contents for Integrity K3060 SR

Page 1: ...e unit is free from defects or shipping damage In the event of a problem DO NOT install the unit Jason Hydrotherapy is not responsible for damage that might have been avoided by inspection or testing...

Page 2: ...ulants stimulants antihistamines vasoconstric tors vasodilators hypnotics narcotics or tranquilizers F Lower water temperatures are recommended for extended use exceeding 10 15 minutes and for young c...

Page 3: ...minutes et pour les jeunes enfants F Puisque les temp ratures excessives ont un potentiel lev pour les f tus durant les premiers mois de la grossesse les femmes enceintes ou possiblement enceintes do...

Page 4: ...du fabricant DANGER Ne pas modifier le c blage install en usine Tous les mat riaux de construction et c blage doivent tre loign s de toutes sources de chaleur moduites par le abin ATTENTION Garder les...

Page 5: ...by testing and resetting it If the unit still fails to operate refer to the Trouble Shooting Guide section of this manual If the unit still fails to operate and is out of warranty contact an authorize...

Page 6: ...se the button AirMasseur Automatic Purge Fifteen 15 minutes after the blower is stopped the blower will start again for a two 2 minute purge cycle that dries the air channel WHIRLPOOL FEATURES Jason s...

Page 7: ...the bath thoroughly after cleaning SURFACE MAINTENANCE Area with minor scratches or dull surfaces can be restored by applying commercially available plastic polish i e Novus Plastic Polish No 2 avail...

Page 8: ...F 22 C 3 Drain and Overflow Install the drain and overflow assembly to the bath shell according to the instructions provided with the drain and position the bath in the area of intended installation...

Page 9: ...ioned in the area of intended installation cut the equipment support strap s to allow the equipment to rest firmly level with the bottom of the bath on the floor We recommend securing the equipment mo...

Page 10: ...alve and the elbow by removing the two 2 screws in the elbow Omit this step on baths where the blower is not factory installed and remote mounting is required 4 Install the blower in the remote locati...

Page 11: ...rol device Likewise the electrical service from the GFCI to the bath control should be direct and not interrupted by a switch Never use a switch in conjunction with a control device This will VOID THE...

Page 12: ...tch actuator and the air switch control box A small bead of silicone may be added to the air tubing connections to help prevent the tubing from disengaging The air switch tubing must also be installed...

Page 13: ...and the air switch control box A small bead of silicone may be added to the air tubing connections to help prevent the tubing from disengaging The air switch tubing must also be installed to allow fo...

Page 14: ...cont WHIRLPOOL WP SYSTEM This Whirlpool bath is provided with an Air On Off switch The tubing should be firmly attached to the bath s air switch actuator and the pump air switch connection A small bea...

Page 15: ...d Check voltage at motor when control is on If no voltage control is defective b Make sure plug is fully inserted into the control box outlet c Check and reconnect if necessary Equipment does not manu...

Page 16: ...serves the right to substitute new or improved equipment on any replacements The repair or replacement of equipment shall be F O B point of shipment This warranty shall not apply to any merchandise wh...

Reviews: