© 2018 Jason
®
Hydrotherapy • tech@jasonhydrotherapy.com
Page 9 of 16
Customer Service : 800.255.5766
INSTALLATION INSTRUCTIONS (cont.)
6. Integral Tile Lip Alcove Installation
After the bath has been leveled, confi rm the height
measurement of the underside of the fl ange deck in order
to install a 1”x2” ledger strip to support the tile lip fl ange
(see
Figure 4
).
Figure 4
Install the 1” x 2” support ledger strip to the framing to
allow support along the entire rear ledge of the bath (see
Figures 2 and 5
).
Figure 5
Carefully drill 1/8” holes through the tile fl ange at each stud
location.
NOTE:
Be sure not to drill the hole at an angle as this
can cause negative draft on the fl ange and result in water
pooling on the deck.
Secure the fl ange to the stud with screws making sure the
screws are installed parallel to the bath to avoid negative
draft.
WARNING: To prevent damaging the acrylic, be careful
not to over-tighten the screws.
7. Tile Flange
100% Silicone with mildew resistant properties should be
applied between the water resistant backer board and the
deck of the deck.
Note:
If you use a tile fl ange kit, modify the framing to
support the bath lip as shown in
Figure 6
.
Figure 6
8. Secure Equipment Mounts
Once the bath is positioned in the area of intended
installation, cut the equipment support strap(s) to allow
the equipment to rest fi rmly, level with the bottom of the
bath, on the fl oor. We recommend securing the equipment
mounts to the fl oor with removable fasteners for ease of
servicing.
9. Acrylic Bath Surface
The acrylic surface of this bath has been provided with
a protective fi lm which helps protect the bath during
shipment and installation. If the bath is tiled in, remove the
necessary portion of the fi lm when installing the tile.
Additional protection may also be required to protect the
acrylic surface during installation. Protect the acrylic bath
surface from damage during installation with a suitable
material, i.e. cardboard and/or plastic fi lm.
10. Cleaning
Remove all loose debris. Construction plaster or excess
grout can be removed with the use of a wood (edge)
trowel. Paint or tar stains may need to be removed with
a cleaner such as paint thinner, turpentine or rubbing
alcohol. Never allow the cleaner to soak against the acrylic
surface for long periods of time.
Always rinse the surface
immediately following the use of cleaners.
11. Water Testing
Before fi nishing the installation, it is recommended that the
bath be water tested and any plumbing tested for leaks.
Height for
Ledger Support
1" X 2"
SUPPORT
SCREW
SILICONE BEAD
TILE
DRYWALL
DRYWALL
TILE
OPTIONAL
TILE FLANGE
KIT
1" X 2"
SUPPORT
SCREW
TILE
FLANGE
BATH LIP
SUPPORT