background image

Need help!

Call us on

1300 527 665

www.jasonl.com.au

ASSEMBLY INSTRUCTIONS

Whistler 2.0

Page 04

STEP 4

(adding the top) is done by putting 
the top upside down on the ground 
first, measuring the top plate to the 
edges & then drilling the screws.

Screw the table top to the base 
through the following holes.

I

Reviews: