background image

 

5 (8) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

F

ig

3

  

C

o

n

n

e

c

ti

o

n

 e

x

a

m

p

le

 1

S

o

lid

-f

u

e

b

o

ile

a

n

d

 e

n

e

rg

y

 s

to

ra

g

e

 

1

 

B

o

ile

(J

Ä

S

P

E

C

O

P

U

U

-2

5

  

 5

  

  

C

h

a

rg

e

 p

u

m

p

 (

U

P

S

 2

5

-6

0

  

  

  

  

 9

 

B

o

ile

c

o

o

lin

g

 c

o

il 

2

 

E

n

e

rg

y

 s

to

ra

g

e

 b

a

tt

e

ry

 (

J

Ä

S

P

O

V

A

L

I)

 

  

 6

  

  

E

x

p

a

n

s

io

n

 t

a

n

k

 

  

  

  

  

1

0

 

B

o

ile

th

e

rm

a

v

a

lv

e

 

3

 

H

o

w

a

te

s

u

p

p

ly

 m

ix

in

g

 v

a

lv

e

 

  

 7

  

  

J

Ä

S

P

6

 k

W

 t

u

b

u

la

e

le

c

tr

ic

 h

e

a

te

  

1

1

 

1

.5

 b

a

re

lie

v

a

lv

e

 

4

 

H

e

a

ti

n

g

 l

o

o

p

 c

ir

c

u

la

ti

n

g

 p

u

m

p

  

  

 8

  

  

B

o

ile

fi

lli

n

g

 v

a

lv

e

 

  

  

  

  

1

2

 

T

h

e

rm

o

s

ta

ti

c

 c

h

a

rg

e

 v

a

lv

e

 

Summary of Contents for ECOWOOD 25

Page 1: ...INSTALLATION AND OPERATION MANUAL ECOWOOD 25 JASPI KNOWS HEATING WWW JASPI CO UK...

Page 2: ...s specified in Chapters 2 10 2 11 3 4 and Subparagraphs and d Chapter 5 Appendix 1 of the directive becomes evident from the entire unit installation and operation instructions The entire unit is manu...

Page 3: ...12 Side brick 2 pcs 13 Rear fire plate 14 Front fire bar brick 15 Rear fire bar 16 Firing throat 17 Coal grate 18 Upper turbulators 19 Lower turbulators PARTS 20 Thermometer 21 Pressure gauge 22 Clea...

Page 4: ...see Fig 3 and 4 Connect a 1 5 bar relief valve to the boiler nozzle ensuring that the steam blow capacity of the valve matches the power of the boiler The pre pressure of the membrane expansion tank...

Page 5: ...arge pump UPS 25 60 9 Boiler cooling coil 2 Energy storage battery J SPI OVALI 6 Expansion tank 10 Boiler thermal valve 3 Hot water supply mixing valve 7 J SPI 6 kW tubular electric heater 11 1 5 bar...

Page 6: ...ank 14 Thermostatic charge valve 3 Energy storage battery J SPI OVALI 9 J SPI 6 kW tubular electric heater 13 Wood boiler thermal valve 4 Hot water supply mixing valve 10 Boiler filling valve 15 Diese...

Page 7: ...h Fig 5 between the front edge of the adjusting plate 30 of the firing throat and the brick of the fire bar 14 must be 12 mm Ajust the top air damper 24 to approx 55 mm clearance While firing keep the...

Page 8: ...Identification code 10 Background brick extension P02030 11 Background vertical brick M01650 12 Side brick M01651 13 Rear fire plate P01321 14 Front fire bar brick M01649 15 Rear fire bar P01320 16 Fi...

Reviews: