2-4
LGG100 Operator’s Manual
www.javad.com
S E T U P A N D M E A S U R I N G
LGG100 Receiver Setup
2
–Enable RTS/CTS handshaking.
Figure 2-2. RS-232 Connection Parameters
Once a PCView connection with the receiver has been established, the
current communications settings – such as, port name, baud rate (if
applicable), and flow control (if applicable) – display in the lower-left
corner of the main window of PCView. A timer begins to count up in the
lower-right corner as well (Figure 2-3).
Figure 2-3. PCView Connection Established
LGG100 Receiver Setup
This section assumes you have already configured your receiver using PCView.
1.
Place the LGG100 on the appropriate position.
2.
Center the receiver over the point at which data will be collected. For most
applications, this should be at a location with a clear view of the sky.
Summary of Contents for LGG100
Page 2: ......
Page 6: ...iv LGG100 Operator s Manual www javad com Notes ...
Page 8: ...vi LGG100 Operator s Manual www javad com Notes ...
Page 24: ...1 10 LGG100 Operator s Manual www javad com Notes ...
Page 50: ...4 8 LGG100 Operator s Manual www javad com Notes ...
Page 58: ...B 6 LGG100 Operator s Manual www javad com APPENDIX Specifications B ...