JAVELIN MACHINERY (AUSTRALIA)
J800 /J900 OPERATION MANUAL
(incl. Troubleshooting Machine Problems)
JULY 2016
Page 10
SETTING UP & OPERATION - UNWIND STAND (if fitted)
Load a jumbo roll onto the unwind shaft. Keep the right end of material about
170mm(7”) from disc brake and tighten RH core lock. A grub screw and hexagonal
key are all supplied with the machine. Push LH core lock into core ( use rubber
mallet if necessary ) then tighten in same manner as LH core lock. Load unwind
shaft on roller guides making sure that disc brake is between the pneumatic brake
pads. Lock unwind shaft with toggle clamp on both ends and replace lock pin (on a
chain).
Material threading diagram ref. to
Fig 4.2
&
Fig. 4.3
then tape leader on to the core
on the mandrel. Ensure material is square to mandrel when taped.
Reset counter then set chuck speed knob to zero.
Switch on chuck. Gently increase chuck speed. Adjust pressure on disc brake as
required.