background image

l

STEP C  J

a.  Mix  the  concrete  according  to  the instructions on  the  bags.  Note that 

a  thicker  mix  of  concrete  v,i!I  dry stronger than a thin mix.  Pour the 

concrete into lhe hole, slopping  approximately  18  inches from lhe !op 

of the hole. 

b.  Insert  !he  four  pieces  of  Anchor Rebar (U5) inlo lhe  hole,  pushing each

piece  firmly  lo  lhe  bollom  of  the  hole.  The  four  pieces  should  be 

arranged in a square approximately 8 inches wide so that each piece of 

rebar  will  be  positioned nexl lo lhe J-Bolls when lhe  J-Boll  Template 

is placed  in  the cement. 

c.  Finish  filling lhe hole lo lhe lop wilh concrete. The lop of lhe concrete 

should reach jusl above lhe level of lhe lop of the form. 

a.  Position  lhe  J-Bolt  Template (U1) over  the  hole  so  that  it  is centered, 

with the sides of !he plale square wilh the sides of the hole. 

b.Push  the  J-Bo!ts  (U2)  !nto  the  concrete  until  the  J-Bolt  Template  is 

resting flat against the surface of the concrete. 

c.  Grasp  !he  lops  of  lhe  J-Bolts and agitate  !he Template  assembly  back 

and forth repeatedly to  eliminate any air bubbles in  the concrete.  Lift the 

Template  slightly  above  the  concrete  when  agitating.  Make  sure  !he 

Template  is  resting  on  the  concrete  after  agitating, Form  the concrete 

into a downward slope away from the  Pole to  allow water runoff. 

d.  Clean off  any concrete that may be  on  the J-Bolt Template or the exposed 

portions of the J-Bolts. 

/ii 

'?? 

;i 

U1 

'i

 i::  

' '  

( f ' l , .  _ _  

.h 

:, 

11 

//  /ii, 

;: 

:: 

cJ 

/  I 

"  , , 

,. 

e.  Using  a  carpenter's level, make sure the Template is  square to  and level 

with the playing surface. 

/ ---- --:.   ------ ----

------- --

. .  

\..:- --   ---·-·· 

: ' 

'' 

f.  Allow· the concrete to  cure  for  a minimum of  5-7 days  before  installing 

lhe  res!  of  your  basketball  system.  In  cold  ,  wet  weather  or  humid 

climates, allow additional time for the concrete to  cure. 

U2 

,' •' ' 

,, 

,: 

YOU  ARE  NOW  FINISHED WITH THE  INITIAL ASSEMBLY STEPS.  DO  NOT PRO-

CEED  WITH THE ASSEMBLY UNTIL THE  CONCRETE  HAS  FULLY CURED.  CUR-

ING  WILL TAKE A MINIMUM OF  72  HOURS.  IN  HUMID  CLIMATES  OR  WET 

WEATHER, ALLOW ADDITIONAL TIME  FOR  THE  CONCRETE TO  CURE. 

WARNING 

NEVEf,  USE  THE  SYSTEM  WITHOUT  FOLLOWING  THE  CEMENTING  INSTRUCTIONS.  FAILURE  TO 

FOLLOW I\LL OF  THESE  INSTRUCTIONS I\ND WARNINGS COULD  LE1\O  TO  SERIOUS PERSONAL  INJURY 

OR  PROPERTY DAMAGE AS LISTED ON  PI\GE  ONE. 

Summary of Contents for CV664A

Page 1: ...ROPFRTY Di i L CiF l I F ISF Ill I D Ill W l NIN S Nil C 1 1 JTIONS TO FNSI il t YOU S 1 1 l TY Dll NOT ITTl ll T T O SSH llliY THIS SYSTHvl IV 1 1IOVT C IRII IIY l F IDIN AND FOLi JIVING ILL NSTRUCTIONS BLCr N BY L JT liY N i ND L K N NVL HOPV O F LL P1 RTS l Sl Ci Tl E RTS LIST PPO DU www jaypro corn 800 243 0533 976 Hartford Tpke Waterford CT 06385 USA Keep this instruction manual in case you h...

Page 2: ...TIONS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND W i l l VOID THE WARf ANTY Tt1e owner rnust ensure that all players know and follow these rules to safely operate the system Proper and complete assembly use and supe1vision is essential for proper operation ancl to rec uce the risk of accident or injury A high probability of serious injury exists if this system is not installed maintained ...

Page 3: ... 4 1 6mm Lock Pin 1 Flex Rim Separate pack 5 2 Hex Bolt M18x l20mm M 1 Rim Pad Pre attached 6 1 Hex Bolt M16x295mm N 1 Backboard mounting bracket 7 2 Hex Bolt M16x320mm UNDERGROUND PARTS 8 1 Hex Bolt M16x185mm U 1 1 Anchor Template 9 1 Hex Bolt M16x135mm U2 4 1smrn Anchor J bolts 10 2 Hex Bolt M12x70mm U3 8 Thick washer for J bo t 1 1 4 Washer for M IS Bolt U4 12 Hex nut M 13 12 10 Washer for M16 ...

Page 4: ...concrete remains straight and square The form should be placed about 1 2 above the playing surface to allow for water drainage c Bell out the bottom of the hole NOTE i i qunrc liolc prevents thi rotation of the concrete NOTE The trca behind the playing surface must be ck 1red o f f by at least f ect w cnabk tht user to tand behind the pole to adjust the Rim height STEP B A Thread a 18mm Hex Nut U4...

Page 5: ...sembly back and forth repeatedly to eliminate any air bubbles in the concrete Lift the Template slightly above the concrete when agitating Make sure he Template is resting on the concrete after agitating Form the concrete into a downward slope away from the Pole to allow water runoff d Clean off any concrete that may be on the J Bolt Template or the exposed portions of the J Bolts ii I i U1 i i f ...

Page 6: ...ho1 Nn in FIGURE 1C U3 U2 I l STEP2 J FIGURE 1A FIGURE 1B Nylon washer 1 ray be factory installed A Slide the Main Extension Arm F over the top of the Main Post A and attach to the lower pivot tube with a M18x320mm Hex Bolt 5 two M18 Flat Washers l 11 two Nylon Washers M18 1 and one Lock nut M18 14 Do not over tighten this bolt and nut Playing Court FIGURE IC Note make sure Nylon washers locate be...

Page 7: ...pring Assist Cartridge C Nylon washer locates between Steel steeves J and Main Extension Arm F They may be factory assembled already 8 Att 1ch the bottom of Spring assist Cartrldqes C to the Main post Bracket by using a Hex Boll M16x185mm 8 two Flat Washers M16 112 one Nylon Washer M16 2 ancl one Hex Nul M16 15 Note Nylon washer goes fJetween two Cartlidges C Remove and discard the Steel spreader ...

Page 8: ... C Re c1ttach Sprin J box cover to the Rim with removed screws i 1 11 1l R2 R3 NOTE Use a level to make sure rim is level side to side before tightening nuts Tiqhten the two bolts and nuts used in STEP 6 I After cverythin9 is square rnake sure ail nuts on the systern have betm tiqhtene1J NOTE Do not ovN i9hton he Nuts mafw sure the uni can he ac jusied up ancl clown B To appiy t h E Him Height Sti...

Page 9: ...FTER GOAL HAS BEEN MOUNTED NOTE THE TWO VERTICAL SPRINGS CAN BE TIGHTENED IF MINOR LOOSENESS OR RATTLING OCCURS ONE OR TWO TURNS OF THE HEX NUT IS SUFFICIENT DO NOT OVER TIGHTEN AS IT WILL DAMAGE GOAL MECHANISM BACKBOARD AND COULD LEAD TO PLAYER INJURY ADJUSTING BREAKAWAY AMOUNT OF FORCE REQUIRED TO RELEASE LOCKING MECHANISM CAN BE ADJUSTED ON BREAKAWAY GOALS REMOVE THE COVER PLATE AND INSERT 3 16...

Reviews: