Install Sleeves:
Dig footing holes and install the ground sleeves as shown in Figure 2.
Pour 6” concrete footing and allow fully curing, or use two concrete blocks or crushed
stone, to rest sleeve on. Wait 24 hours before inserting poles.
Figure 2
Install Pole Hardware:
Assemble 3/8” eyebolt hardware & 1/4" cleat hardware and pole cap onto the poles as
shown in Figure 3 & Figure 4. Route the hoisting rope through the pulley. Attach the
snap hook to the hoisting rope with a bowline knot. Temporarily attach the free end of the
hoisting rope to the snap hook. See note on swivel pulley feature on page 6 of 8.
Figure 3
Concrete, block or crushed stone.
Concrete
Note these are suggested dimensions for average
soil conditions, consult local building codes.
3/8"-16 x 5" LONG THREADED EYEBOLT
3/8" FLAT WASHER
4" ROUND RIBBED INSERT CAP
3/8"-16 HEX HD LOCKNUT
SWIVEL PULLEY
5/16” x 3 1/8” SNAP HOOK
HOISTING ROPE x 45 FT
LONG (BOW LINE KNOT)
3/8" FLAT WASHER
TOP OF POLE
5/16” x 3 1/8” SNAP HOOK
TEMPORALLY TIE ROPE
~
Ba