OK
TOOL
EAR
THING FUSE
AUX
USE ONL
Y
WITH A 250
V FUSE
OK
TOOL
EAR
THING FUSE
AUX
USE ONL
Y
WITH A 250
V FUSE
OK
TOOL
EAR
THING FUSE
AUX
USE ONL
Y
WITH A 250
V FUSE
Fuse
holder
Before carrying out maintenance, always switch the device off and disconnect it from the mains.
Allow the equipment to cool down.
- Clean the station screen with a glass
cleaner or a damp cloth.
- Use a damp cloth to clean the casing and
the tool. Alcohol can only be used to clean
the metal parts.
- Periodically check that the metal parts
of the tool and stand are clean so that the
station can detect the tool status.
- Maintain tip surface clean and tinned prior
to storage in order to avoid tip oxidation.
Rusty and dirty surfaces reduce heat transfer
to the solder joint.
- Periodically check all cables and tubes.
- Replace any defective or damaged pieces.
Only use original JBC spare parts.
- Replace a blown fuse as follows:
1. Pull off the fuse holder and remove the
fuse. If necessary use a tool to lever it off.
2. Insert the new fuse into the fuse holder
and return it to the station.
Maintenance
- When this warning appears on the
main screen Earthing Fuse must be replaced
- Repairs should only be performed by a JBC authorized technical service.
Clean
periodically
EARTH
FUSE
14