Operation
Working with the Machine
134
134
9811/9950-1
Scraping and Cutting
If a deep cut is to be made, do it in steps of about 50mm
(2in). Do not forget to adjust the dozer height when the
machines tracks enter the cut.
Backfilling
When backfilling on a slope, pile the material on the high
side of the trench whenever possible. Set the dozer level
to the ground. Work at right angles to the trench filling a
dozer's width at a time. Leave any spillage until the trench
is filled. Use the spillage to finish the job by driving the
length of the trench with the dozer low to the ground.
732030-2
Fig 63.
HE Services
Summary of Contents for 8026 CTS
Page 2: ...0 0 9811 9950 Notes E S e r v i c e s...
Page 68: ...Operation Entering and Leaving the Cab 50 50 9811 9950 1 Fig 8 B A E S e r v i c e s...
Page 71: ...Operation Doors and Windows 53 53 9811 9950 1 C035100 Fig 11 E S e r v i c e s...
Page 103: ...Operation Operating Levers Pedals 85 85 9811 9950 1 731911 Fig 36 F E S e r v i c e s...
Page 105: ...Operation Operating Levers Pedals 87 87 9811 9950 1 731911 Fig 38 F E S e r v i c e s...
Page 111: ...Operation Operating Levers Pedals 93 93 9811 9950 1 796300 B4 Fig 43 A B D E S e r v i c e s...
Page 141: ...Operation Working with the Machine 123 123 9811 9950 1 731990 2 Fig 55 1 2 3 E S e r v i c e s...
Page 171: ...Operation Transporting the Machine 153 153 9811 9950 1 800990 4 Fig 68 E S e r v i c e s...
Page 257: ...Routine Maintenance Fuel System 239 239 9811 9950 1 T015790 2 Fig 93 A E S e r v i c e s...
Page 266: ...Routine Maintenance Tracks and Running Gear 248 248 9811 9950 1 Fig 98 E S e r v i c e s...
Page 320: ...Specifications Vibration 302 302 9811 9950 1 Page left intentionally blank E S e r v i c e s...