Optional Attachments
Buckets
271
271
9811/9950-1
Installing a Bucket - Non Quickhitch
Models
See
Bucket Selection.
Note: This job is easier done by two people - one to
operate the controls and one to line up the pivots.
1
Position the Bucket
Set the bucket flat on level ground, using a suitable
lifting device.
!M
WARNING
Do not use your fingers through the holes to align the
links.
8-2-9-32
2
Engage the Dipper
If necessary move the machine to align the pivot pin
holes. Carefully align the holes in the dipper and
bucket link with the bucket. Fit the pivot pins
B
and
lynch pin
A
.
K
Fig 106. (
T
269)
Fig 107.
B
A
HE Services
Summary of Contents for 8026 CTS
Page 2: ...0 0 9811 9950 Notes E S e r v i c e s...
Page 68: ...Operation Entering and Leaving the Cab 50 50 9811 9950 1 Fig 8 B A E S e r v i c e s...
Page 71: ...Operation Doors and Windows 53 53 9811 9950 1 C035100 Fig 11 E S e r v i c e s...
Page 103: ...Operation Operating Levers Pedals 85 85 9811 9950 1 731911 Fig 36 F E S e r v i c e s...
Page 105: ...Operation Operating Levers Pedals 87 87 9811 9950 1 731911 Fig 38 F E S e r v i c e s...
Page 111: ...Operation Operating Levers Pedals 93 93 9811 9950 1 796300 B4 Fig 43 A B D E S e r v i c e s...
Page 141: ...Operation Working with the Machine 123 123 9811 9950 1 731990 2 Fig 55 1 2 3 E S e r v i c e s...
Page 171: ...Operation Transporting the Machine 153 153 9811 9950 1 800990 4 Fig 68 E S e r v i c e s...
Page 257: ...Routine Maintenance Fuel System 239 239 9811 9950 1 T015790 2 Fig 93 A E S e r v i c e s...
Page 266: ...Routine Maintenance Tracks and Running Gear 248 248 9811 9950 1 Fig 98 E S e r v i c e s...
Page 320: ...Specifications Vibration 302 302 9811 9950 1 Page left intentionally blank E S e r v i c e s...