Specifications
Static Dimensions
290
290
9811/9950-1
Table 5. Machine Dimensions
8026 CTS
8025 ZTS
8030 ZTS
8035 ZTS
mm (ft-in)
mm (ft-in)
mm (ft-in)
mm (ft-in)
A
Overall Height (transport position)
(1)
(1)
Does not include truck/trailer height.
2470 (8-1)
2470 (8-1)
2470 (8-1)
2475 (8-2)
B
Overall Length (transport position)
4220 (13 -10)
4280 (14 -0)
4287 (14-0)
4462 (14-8)
C
Tailswing
1225
(4-0)
750
(2-5)
800 (2-7)
850 (2-10)
D
Track Width
1502 (4-11)
1502 (4-11)
1650 (5-5)
1750 (5-9)
E
Superstructure Width
1550 (5-1)
1550 (5-1)
1650 (5-5)
1656 (5-5)
F
Track centres
1440 (4-8)
1440 (4-8)
1597 (5-2)
1707 (5-6)
HE Services
Summary of Contents for 8026 CTS
Page 2: ...0 0 9811 9950 Notes E S e r v i c e s...
Page 68: ...Operation Entering and Leaving the Cab 50 50 9811 9950 1 Fig 8 B A E S e r v i c e s...
Page 71: ...Operation Doors and Windows 53 53 9811 9950 1 C035100 Fig 11 E S e r v i c e s...
Page 103: ...Operation Operating Levers Pedals 85 85 9811 9950 1 731911 Fig 36 F E S e r v i c e s...
Page 105: ...Operation Operating Levers Pedals 87 87 9811 9950 1 731911 Fig 38 F E S e r v i c e s...
Page 111: ...Operation Operating Levers Pedals 93 93 9811 9950 1 796300 B4 Fig 43 A B D E S e r v i c e s...
Page 141: ...Operation Working with the Machine 123 123 9811 9950 1 731990 2 Fig 55 1 2 3 E S e r v i c e s...
Page 171: ...Operation Transporting the Machine 153 153 9811 9950 1 800990 4 Fig 68 E S e r v i c e s...
Page 257: ...Routine Maintenance Fuel System 239 239 9811 9950 1 T015790 2 Fig 93 A E S e r v i c e s...
Page 266: ...Routine Maintenance Tracks and Running Gear 248 248 9811 9950 1 Fig 98 E S e r v i c e s...
Page 320: ...Specifications Vibration 302 302 9811 9950 1 Page left intentionally blank E S e r v i c e s...