P/N 960-100929R_Rev. 3 {EDP #148849}
© 2012, Japan CashMachine Co., Limited
4 - 5
Disassembly/Reassembly
iVIZION® Series Next-Generation Banknote Acceptor Unit
Section 4
Validation Unit Harness Removal
To remove the Validation Unit Harness proceed as
follows:
1. Remove the two (2) mounting Screws (See Figure
1
& a
2
) retaining the Validation Unit
Harness in place (See Figure 4-18 b).
2. Remove the Validation Unit Harness from the
Transport Unit.
Interrupter Board Removal
To remove the Interrupter Board proceed as
follows:
1. Remove the two (2) mounting Screws (See Figure
1
& a
2
) retaining the Interrupter Board to
the Assembly (See Figure 4-19 b), and carefully
unplug the three (3) Signal Connectors
1,
c
2
& c
3
) from the Board.
2. Carefully pull the Interrupter Board off of the
Motor Module Assembly.
Motor Unit Timing Belt Removal
To remove the Timing Belt, proceed as follows:
1. Remove the two (2) mounting Screws (See Figure
1
& a
2
) and remove Drive Mod FR “A”
(See Figure 4-20 b) from the Motor Module
Assembly.
NOTE: When installing new FPCs, fold-up
along the Solid Lines and fold-down along
the Dashed Lines before setting them in
place. Once an FPC is folded, DO NOT
refold it back again or in the opposite
direction once folded!
Figure 4-16
Motor Module Removal
a
1
a
2
b
Figure 4-17
USB FPC, Power FPC & Interface
FPC Cable Removal
a
b
c
Dashed Line
for Fold Up
Solid Line
for Fold Down
NOTE: Ensure that when the Collars
1
& c
2
) and/or Washers
are removed (See Figure 4-18 d
1
& d
2
) that
they are not accidentally lost once they are
removed.
Figure 4-18
Validation Unit Harness Removal
a
1
a
2
d
1
b
d
2
c
1
c
2
Figure 4-19
Interrupter Board Removal
a
1
a
2
c
3
c
1
c
2
b
Figure 4-20
Timing Belt Removal
a
1
a
2
b
c
d