P/N 960-100928R_Rev. 3 {EDP #192692}
© 2018, JAPAN CASH MACHINE CO., LTD.
2 - 1 4
Section 2
UBA-RC™ Series Banknote Recycler
Installation
Operational
Flowcharts (Continued 3)
Figure 2-17 depicts a typical UBA-RC
™
Recycler Stacking flow process.
Figure 2-17
C1) Return from Figure 2-15 “Validation” Flow on
page 2-12 of this Service Manual
c) Was transportation retried three (3) time?
d) Rotating the Anti-Pullback (PB) Unit
g) Sending an Acceptance VEND Signal
i) Is the Recycler Unit full?
j) Sending a FULL Signal (*3)
a) Transporting the Banknote to the Recycler Unit
f) Stop performance, and send an Abnormal Oper-
ation Signal (*2)
b) Is the Banknote transporting?
e) Was an Abnormal Error detected by the PB Unit?
h) Stacking the Banknote
A) Return to the Figure 2-14 “Primary Sequence” Flow
on page 2-11 of this Service Manual
*2). When an abnormal signal is received, remove and re-supply Power to the UBA-RC after resolving the problem, or send a
RESET Command from the Host Machine.
*3). When either the RC1 or RC2-Bin Space inside the Recycler Unit is full, the recyclable Banknotes are stacked into the Cash
Box until the “Full” detection is cleared. The UBA-RC responds via Status Request from the Host Machine while it is
performing when either the RC1 or RC2-Bin Spaces are full.
a
b
A
YES
NO
c
d
e
f
g
h
j
i
YES
YES
NO
NO
NO
YES
Figure 2-17
UBA-RC Operational Flowchart (Stacking/Recycle Unit)