P/N 960-100928R_Rev. 3 {EDP #192692}
© 2018, JAPAN CASH MACHINE CO., LTD.
2 - 1 6
Section 2
UBA-RC™ Series Banknote Recycler
Installation
Operational
Flowcharts (Continued 5)
Figure 2-19 depicts a typical UBA-RC
™
Dispensing flow process.
Figure 2-19
C2) Return from the Figure 2-14 “Primary Sequence”
Flow on page 2-11 of this Service Manual
b) Collecting the Banknote data
d) Is the Banknote transporting toward the Exit Slot?
e) Was Banknote transportation retried ten times?
f) Stop performance, and send a DISPENSE signal
(*5)
h) Has the Banknote been removed?
a) Transporting the Banknote
c) Is the Banknote abnormal condition?
g) Sending an Abnormal Operation Signal
A) Return to the Figure 2-14 “Primary Sequence”
Flow on page 2-11 of this Guide
i) Sending VEND Signal
j) Is the required counts of Banknote being
dispensed?
E) To the Figure 2-20 “Banknote Abnormal
Detection” Flow process on page 2-17 of this
Service Manual
*5). The specific Banknote position may be treated as Abnormal, and an “Abnormal Condition Error” state will occur instead of
the normal dispensing “VEND Signal” being sent.
E
A
a
b
c
d
e
h
f
g
i
j
YES
YES
YES
YES
YES
NO
NO
NO
NO
NO
Figure 2-19
UBA-RC Operational Flowchart (Dispensing)