P/N 960-000180R_Rev. 1 {EDP #233427}
© 2016, JAPAN CASH MACHINE CO., LTD.
4 - 2
Section 4
DBV® Series DBV-400 Banknote Validator
Disassembly/Reassembly
5. Unplug the single (1) Connector (Figure 4-5
a
).
6. Remove the four (4) Mounting Screws (Figure 4-
b
1
through
b
4
) securing the CPU Circuit Board
a
) to the Main Frame Assy. (Figure 4-
d
).
7. Unplug the five (5) Connectors (Figure 4-6
c
1
through
c
5
), and remove the CPU Circuit Board
from Main Frame Assy. (Figure 4-6
d
).
Side Sensor Removal
To remove the Side Sensors, proceed as follows:
1. Unplug the two (2) Connectors (Figure 4-7
c
1
and
c
2
).
2. Remove the two (2) Mounting Screws (Figure 4-7
b
1
and
b
2
) securing the Side Sensors (Figure 4-7
a
1
and
a
2
), and remove the two (2) Side Sensors
from the Main Frame Assy. (Figure 4-7
d
).
Motor Harness Assy. Removal
To remove the Motor Harness Assy., proceed as
follows:
1. Remove the eight (8) Mounting Screws (Figure 4-
b
1
and
b
8
) securing the Motor Gear Cover D4
a
), and remove the Motor Gear Cover
D4 from the Main Frame Assy. (Figure 4-8
c
).
2. Remove the Motor Harness Assy. (Figure 4-8
d
)
from the Main Frame Assy.
Inside Validation Sensor Board
Removal
To remove the Inside Validation Sensor Board, pro-
ceed as follows:
1. Press the Validation Guide Open/Close Latch
a
) upward and pull the Validation
b
) out of the Main Frame.
2. Remove the four (4) Mounting Screws (Figure 4-
b
1
through
b
4
) securing the Validation Guide
Cover Assy. (Figure 4-10
a
), and separate the
Validation Guide Cover Assy. from the Main
c
).
Figure 4-5
Figure 4-5
Unplugging Connector
a
Figure 4-6
Figure 4-6
CPU Circuit Board Removal
a
a
b
1
b
2
b
3
b
4
1
c
2
c
5
c
4
c
3
d
Figure 4-7
Side Sensor Removal
c
1
c
2
a
1
a
2
b
1
b
2
d
Figure 4-8
Figure 4-8
Motor Harness Assy. Removal
a
c
b
1
b
2
b
3
b4
b
5
b
6
b
7
b
8
d
Figure 4-9
Figure 4-9
Validation Guide Removal
a
b