P/N 960-000164R_Rev. 3 {EDP #213631}
© 2018, JAPAN CASH MACHINE CO., LTD.
2 - 2 0
Section 2
iPRO-RC™ Series Banknote Recycler
Installation
Operational Flowchart (Continued)
Figure 2-18 depicts a typical iPRO-RC™ Recycler Unit Stacking flow process.
Figure 2-18
Figure 2-18
iPRO-RC Operational Flowchart (Stacking/Recycler Unit)
C1) Return from Figure 2-17 “Validation” Flow on
page2-19 of this Service Manual
c) Was transportation retried three (3) time?
d) Rotating the Anti-Pullback (PB) Unit
g) Sending an Acceptance VEND Signal
i) Is the Recycler Unit full?
j) Sending a FULL Signal (*2)
a) Transporting the Banknote to the Recycler Unit
f) Stop performance, and send an Abnormal Oper-
ation Signal (*1)
b) Is the Banknote transporting to the Recycler Unit?
e) Was an Abnormal Error detected by the PB Unit?
h) Stacking the Banknote
A) Return to the Figure 2-16 “Primary Sequence” Flow
on page2-18 of this Service Manual
*1). When an abnormal signal is received, remove and re-supply Power to the iPRO-RC after resolving the problem, or send
a RESET Command from the Host Machine.
*2). When either the RC1 or RC2-Bin Space inside the Recycler Unit is full, the recyclable Banknotes will be stacked into the
Cash Box until the “Full” detection is cleared. The iPRO-RC responds via Status Request from the Host Machine while it
is performing when either the RC1 or RC2-Bin Spaces are full.