P/N 960-000164R_Rev. 3 {EDP #213631}
© 2018, JAPAN CASH MACHINE CO., LTD.
4 - 9
Disassembly/Reassembly
iPRO-RC™ Series Banknote Recycler
Section 4
2. Remove the two (2) E-Rings (Figure 4-26
a
1
&
a
2
) retaining the Centering Guide Shaft (Figure 4-
b
) in place, and remove the Centering Guide
Shaft, the End Lever (Figure 4-26
c
) and the sin-
gle (1) Spring (Figure 4-26
d
) from the RC Cen-
tering Guide.
3. Remove the two (2) E-Rings (Figure 4-27
a
1
&
a
2
) retaining the RC Centering Guide Shaft (Fig-
b
) in place; then remove the Centering
Guide Shaft, Pick Roller (Figure 4-27
c
) and sin-
gle (1) Gear (Figure 4-27
d
).
Feed Roller Removal
To remove the Feed Roller, proceed as follows:
1. Remove the four (4) Mounting Screws (Figure 4-
a
1
to
a
4
) retaining the RC Course Assy. (Figure
b
) in place, and remove the Race from the
Cash Box Unit.
2. Remove the four (4) E-Rings (Figure 4-29
a
1
to
a
4
), the four (4) Bearings (Figure 4-29
b
1
to
b
4
),
and the two (2) Gears (Figure 4-29
c
1
&
c
2
); then
pull the two (2) Shafts (Figure 4-29
d
1
&
d
2
) out
of the RC Course Assy..
3. Remove the two (2) E-Rings (Figure 4-30
a
1
&
a
2
), the Feed Roller (Figure 4-30
b
), the single (1)
c
), the single (1) Bearing
d
), the single (1) Gear (Figure 4-30
e
), the two (2) Parallel Pins (Figure 4-30
f
1
&
f
2
)
and the single (1) Vinyl Poly Slider (Figure 4-30
g
) from the Shaft.
Figure 4-25
a
1
a
2
b
2
b
1
c
Figure 4-25
RC Centering Guide Removal
Figure 4-26
1
a
2
b
c
d
Figure 4-26
End Lever Removal
Figure 4-27
a
2
b
d
Figure 4-27
Pick Roller Removal
Figure 4-28
a
1
a
2
a
3
a
4
b
Figure 4-28
RC Course Assy. Removal
Figure 4-29
a
1
b
1
b
2
b
3
b
4
a
2
a
4
c
1
c
2
d
1
d
2
Figure 4-29
Transport Race Shaft Removal
NOTE: Be careful that the Parallel
Pins are not lost when removing
their related Spacer and Gear.
NOTE: When reassembling the
Feed Roller, align both the Spacer
and the Feed Roller teeth to the
correct mesh (Figure 4-30
h
).