P/N 960-000164R_Rev. 3 {EDP #213631}
© 2018, JAPAN CASH MACHINE CO., LTD.
6 - 7
Performance Tests
iPRO-RC™ Series Banknote Recycler
Section 6
15. Remove the KS-087 Reference Paper from the
Validator Head.
16. Confirm that the message “
Double Note Detection
Sensor Validation Success.
a
)
appears in the upper Text Field area of the Screen.
This message notifies the User that Double Note
Detection Sensor Calibration procedure is com-
plete.
17. Prepare to start the RC Full Sensor Calibration
Procedure by following the Instructional Message
stated in the Figure 6-32
Text Field.
Ensure that no KS-087 Reference Paper, or any
Banknotes or Tickets are present within the Recy-
cler Unit; and then click on the “
Start
”
Screen Button (Figure 6-32
c
) to begin the RC
Full Sensor Calibration Procedure.
18. Confirm that the Test’s progress appears on the
“
iPRO-RC Maintenance Tool
” Screen by view-
ing the Figure 6-33
a
Green
Progress Bar.
.
19. Confirm that the message “
RC Full Sensor Cali-
bration Success
” appears (Figure 6-34
a
). The RC
Full Sensor Calibration is complete.
20. Click on the “
Start
”
Screen Button (Fig-
b
) and follow the Instructional Message
stated in the Figure 6-34
c
Text Field to begin the
Transport Sensor Check.
21. Confirm that the Test’s progress appears on the
“
iPRO-RC Maintenance Tool
” Screen by view-
ing the Figure 6-35
a
Green
Progress Bar.
22. Confirm that the message “
Transport Sensor
Check Success
.
” (Figure 6-36
a
) appears. The
Transport Sensor Check is complete when this
message appears.
23. Click on the “
Start
”
Screen
Button (Figure 6-36
b
) and follow the Instruc-
tional Message stated in the Figure 6-36
c
Text
Field to begin the RC Spaces Transport Motor
Test.
Figure 6-31
Figure 6-31
iPRO-RC Maintenance Tool Screen 3
a
Figure 6-32
Figure 6-32
iPRO-RC Maintenance Tool Screen 4
a
b
c
NOTE: The RC End Sensor Calibration
Procedure is performed during the RC Full
Sensor Calibration Procedure.
NOTE: Once the RC Full Sensor
Calibration Procedure has begun, the
Lifter within the Recycler Unit will move
upward, and then return to its Home
position when the Calibration Procedure
is complete.
Figure 6-33
iPRO-RC Maintenance Tool Screen 5
a
Figure 6-34
Figure 6-34
iPRO-RC Maintenance Tool Screen 6
b
a
c
Figure 6-35
iPRO-RC Maintenance Tool Screen 7
a