Chapter 1
2000 Platform Overview
Unpacking the instrument
2
User Manual
790000002/00
Unpacking the instrument
1
Remove the 2000 Platform and its accessories from the packing
case.
2
Check that the module and accessories ordered are all there.
If any part is missing or damaged please contact your local JDSU agent.
The 2000 Platform is delivered as standard with:
About the 2000 Platform
The architecture of the 2000 Platform is made of one Platform, to which
a module can be added to perform tests on fiber networks.
The modules that can be fitted to the 2000 Platform are interchangebale
in the field and different kinds of module are usable:
–
OTDR Modules
–
PON Selective Power Meter (OLP)
–
CWDM Analyzer Modules (C-OSA)
The 2000 Platform employs multi-tasking for the simultaneous perfor-
mance of several operations:
–
acquisitions
–
modifications of parameters
–
trace analysis
–
report management
Table 1
Elements delivered on standard with the 2000 Platform
A Getting Started Manual
A Li-Polymer battery, set into the equipment and which must be
charged before use
A mains adapter used for mains operation of the instrument and
battery charging
5 country adaptable plugs (Europe / UK / US / Australia / Japan)
A hands-free soft case for the 2000 Platform
A USB cable, to directly connect the 2000 Platform to a PC
A shoulder strap
2000 Platform English rev00.book Page 2 Lundi, 20. juin 2011 1:47 13