background image

STORMSURE/STORMSURE /REGENCY      

FITTING & FIXING GUIDELINES

3

Finishing

1

If windows are supplied primed or base coat stained 

then as soon as these products are exposed to the 

elements they are at risk.
Under normal building conditions primed windows 

require an undercoat and top coat of paint within three 

months and if basecoat stained then an application of 

high build stain within one month of exposure. 
If primed and in particular basecoat stain finishes have 

deteriorated because of prolonged exposure, the surface 

must be properly prepared, and re-primed before finishing 

and a knotting solution should be applied over any 

visible knots. Take care not to paint over any form of 

weatherstrip as this will adversely affect the performance.

JELD-WEN fully finished windows have a Hi-Build 

factory applied paint (or stained) finish. It is tough, 

durable and microporous allowing the timber to 

breathe, preventing build-up of excess moisture 

under the coating. 
Modest maintenance of the finish is important to 

ensure the long service of these products.
Step by Step maintenance guide 

1.  Annual Inspection: The paint finish should be 

inspected annually (as a minimum) for damage, 

typically caused by a window cleaners ladder or 

objects being passed through the window.

2.  If damage is found it must be dealt with promptly by 

sanding back to the undamaged frame and touching 

up with a matching microporous paint and top coat.

3.  The intervals between planned maintenance cycles will 

vary depending on your location and exposure rating 

- maritime or industrial areas require more regular 

re-decoration than sheltered locations. Please refer to  

www.jeld-wen.co.uk

 for further information.

The first maintenance cycle should be carried out, 

regardless of the appearance of the windows. The original 

paint finish in exposed areas will have worn away to 

around half its original specification and will need to be 

restored back to its original state. Simply wash the frame 

down with a dilute soap solution, dry and lightly rub 

down the surface with fine ‘wet and dry’ sandpaper, grit 

(280 to 400) grade. Dust off and clean using a damp cloth 

removing any remaining surrounding dust, then apply one 

top coat of microporous paint* over the exposed surfaces. 

There should be no need to paint rebates or concealed 

faces as these should be in good condition and no erosion 

should have occurred. The next planned maintenance 

cycle should be in no longer than 7 years. In more severe 

locations it is recommended to carry this out more 

frequently to maintain protection.
*  Microporous paint that is either water or solvent (oil) 

based can be used. Manufacturer’s instructions must 

be followed paying particular attention to temperature 

at the time of application.

Cleaning 

When cleaning the outside (or inside) of windows fitted 

with projecting hinges or reversible hardware from the 

inside, care must be taken to ensure maximum safe 

reaching capabilities detailed in BS 8213-1 are not 

exceeded. Building design and reveal depths can affect 

this and considerations must be taken during the risk 

assessment for safe cleaning for each installation. This 

can be assisted by using an extended implement for 

cleaning. 

Condition of Sale 

In the event of this window being proven to have a 

manufacturing defect, where a replacement is needed, 

the liability of the seller shall under no circumstances 

exceed the price of the defective window. We shall 

not be held responsible for any incidental work or 

for problems resulting from poor workmanship. The 

foregoing does not affect your statutory rights.
For further information please refer to our website  

www.jeld-wen.co.uk
Due to the construction of engineered timber: 

•  finger/laminate joints maybe visible on the finished 

product.

•  visible grain can vary between individual engineered 

sections.

•  timber is a natural product and will swell or shrink to 

varying degrees dependent on location etc.

Glass units 

•  Defects will only be considered under the standards of 

the GGF Code of Good Practice

•  Due to the high thermal properties of insulating glass 

units, condensation may form on external faces of the 

glass units if environmental conditions allow.

Thermal Bridging 

•  in certain applications this may result in condensation 

forming on the products metallic surfaces.

Biocide Regulation: 

JELD-WEN exterior joinery is treated with an approved wood 

preservative and protected against wood decaying fungi.
For Stormsure/Stormsure /Regency products the 

active ingredient is propiconazole.
Preserved wood should not be cut or otherwise 

reworked as this will expose un-preserved wood.  

Any surface which is exposed by cutting or drilling  

must be re-treated with an HSE approved cut end  

preservative.Follow the instructions for safe use on  

the manufacturers’ safety data sheet.
Dispose of all preserved timber using a method approved 

by a waste disposal authority.
Do not burn.

JWW3203_18708_Stormsure _Fit_instruct_A5.indd   3

JWW3203_18708_Stormsure _Fit_instruct_A5.indd   3

09/02/2021   11:52

09/02/2021   11:52

Summary of Contents for Stormsure

Page 1: ... injury during manual handling and particular precautions are required when working at height The following instructions and recommendations must be followed Failure to do so may affect the guarantee and the long term performance of the window and glazing JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 1 JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 1 09 02 2021 11 52 09 02 2021 11 52 ...

Page 2: ...04 Installation 05 Hinge Operation 06 Maintenance 08 Performance 08 Guarantees 09 Troubleshooting Guide 11 IMPORTANT Installation of these Windows should be carried out by a minimum of two people Prior to installing the product please ensure you have carefully inspected each package In the unlikely event you discover any damage or defect do not proceed to fit until you have notified JELD WEN 0845 ...

Page 3: ...uld be in no longer than 7 years In more severe locations it is recommended to carry this out more frequently to maintain protection Microporous paint that is either water or solvent oil based can be used Manufacturer s instructions must be followed paying particular attention to temperature at the time of application Cleaning When cleaning the outside or inside of windows fitted with projecting h...

Page 4: ...use and encourage hot humid conditions There should be space for air to circulate around the windows Factory finished and or glazed windows need extra care to avoid damage to the painted surfaces or glass They should be stored vertically to prevent water accumulating on top of the glazing units When being removed from storage windows should be lifted not dragged They should be lifted by the main f...

Page 5: ...evels of air tightness There should be a correctly installed damp proof course around all the openings to prevent moisture moving from the outer construction to the inner construction There should be adequate insulation fitted between the inner and outer construction to reduce heat loss at the window openings The window should be positioned in the opening such that it covers at least 30mm of the i...

Page 6: ...rt the key head into the groove of the locking button and rotate in the direction indicated to unlock 2 Repeat to top and bottom hinge Note If restrictor has been fitted it must be released prior to attempting the easy clean function 3 Safely holding the sash push towards the centre of the opening The sash will slide to its limit on the hinge 4 By closing the sash the hinges return to the fire egr...

Page 7: ...on Gently lift the restrictor arm A to disengage restrictor and push sash open Some top hung sashes will have a restrictor fitted to both sides Side hung operation Gently pull the restrictor arm A towards you and push sash open Hinge Operation cont 6 STORMSURE STORMSURE ENERGY REGENCY FITTING FIXING GUIDELINES JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 7 JWW3203_18708_Stormsure Energy _F...

Page 8: ... drainage holes channels and spaces are kept clear Use a soft flexible brush or pipe cleaner with care to remove obstructions Leaded lights Like any natural lead product exposed to the environment lead profile will undergo certain atmospheric transformation This is perfectly natural and it will eventually settle down to take on the traditional weathered lead appearance so admired in ancient buildi...

Page 9: ...oat of paint within three months of purchase and one month if basecoat stained If primed and in particular basecoat stain finishes have deteriorated because of prolonged exposure the surface must be properly prepared and re primed before finishing and a knotting solution should be applied over any visible knots Take care not to paint over any form of weatherstrip as this will adversely affect the ...

Page 10: ...o repairs or alterations to the surrounding buildings have occurred which are detrimental to the joinery performance No failure of the coating has occurred caused by failure of ancillary products or glazing No damage to the coatings has occurred prior to or during installation No damage to the coating has occurred caused by bad maintenance of the building or poor design of the building JWW3203_187...

Page 11: ...b and level Have you fitted the window in too small an opening pinching the frame Has the handle been properly engaged Are you using the correct key How do I adjust the window height width If you have ordered the window too large for the opening a new window should be ordered Taking care to ensure correct dimensions guidance is given within the JELD WEN catalogue Any alteration to the product size...

Page 12: ...Bar Oak Casement SS MF JWW 3203 NOV20 18708 www jeld wen co uk STORMSURE STORMSURE ENERGY REGENCY FITTING FIXING GUIDELINES 04 NOV20 JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 12 JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 12 09 02 2021 11 52 09 02 2021 11 52 ...

Reviews: