background image

ZR12-AL USER GUIDE

The

has the ability to connect machines together using a Din lead

and then operating all of the machines with one controller. This is ideal when

there is a need for lots of smoke and there is no DMX to operate the machines.

Simply remove the controllers from all but one of the machines and then connect

a Din lead (5 pin) from the slave socket of the first machine (the one with the

controller) to the next machine’s remote socket, and then from that machine’s

slave to the next machine’s remote socket. This can be done from two up to ten

machines maximum. All of the machines will operate with the same output and

timer settings as the first machine.

ZR12-AL

Pin 1 - NA

Pin 2 - Gnd

Pin 3 - NA

Pin 4 - NA

Pin 5 - 0 - 10v

Wiring of Din

PAGE 8

MARTIN MANUFACTURING (UK) PLC

Using The Analogue Link

Master Machine

Link Cable From Master to Slave

Slave Socket

Remote Socket

Slave Machine

ZR12-AL USER GUIDE

Getting Started

Once you have selected the best position for the

you can begin to

use the machine. First check the power supply you have is correct for the

machine, if it is you can connect to the power supply and switch the mains

switch on at the rear of the machine. This will light when switched on, now

de-press the grey “stand-by” button, the machine will now heat up which

takes around 7 - 8 minutes. While it heats up you should check the level in

the fluid container, the container can hold up to 2.5 litres of fluid.
NOTE! Do not allow the

to run out of fluid. Serious damage may

occur if the machine is operated when no fluid is connected.

When the machine has reached working temperature the green “ready” LED

will light on the top of the machine and the machine can now be operated.

Check the “output” knob is turned fully clockwise (maximum) and press and

hold the red “fog” button. The fluid pump will start operating and if the

machine has a new container of fluid the fluid will take a few seconds to

reach the pump. When the pump has primed smoke will be visible. The output

can now be set to the desired level by turning the “output” knob. The timer

may be activated or you can simply use the “FOG” button when smoke is

required.
Once you have finished using the machine you should de-press the “stand-

by” button and then turn the mains switch off. If any problems occur when

operating the

please refer to the trouble shooting guide..

ZR12-AL

ZR12-AL

ZR12-AL

PAGE 5

MARTIN MANUFACTURING (UK) PLC

Summary of Contents for ZR12-AL

Page 1: ...ACTURED BY MARTIN MANUFACTURING UK PLC BELVOIR WAY FAIRFIELD INDUSTRIAL ESTATE LOUTH LINCOLNSHIRE LN11 0LQ TEL 01507 604399 FAX 01507 601956 ZR12 AL USER GUIDE VERSION 1 4 MARTIN MANUFACTURING UK PLC ZR12 AL ...

Page 2: ...as MARTIN MANUFACTURING UK PLC Fluids Suitable For This Machine Pro Smoke Super Regular DJ Pro Smoke High Density Pro Smoke Studio ZR12 AL USER GUIDE ZR12 AL USER GUIDE How To Contact Us MARTIN MANUFACTURING UK PLC Address Telephone Fax Email jem martin dk Website Http www jemsmoke com Martin Manufacturing uk Plc Belvoir Way Fairfield Industrial Estate Louth Lincolnshire LN11 0LQ 44 0 1507 604399 ...

Page 3: ...dify or change the specification of this product without prior notice No part of this publication shall be copied without permission Martin Manufacturing UK 1999 Introduction Safety Machine Layout Getting Started Using The Remote Control Using The Analogue Link The ZR12 AL Ducting Kit Trouble Shooting How To Contact Us ZR12 AL USER GUIDE ...

Page 4: ...ng A multi function controller enables the user to operate the machine manually using the FOG button or set the timer for auuotmatic operation The timer has a new feature called x8 mode this allows the timer values to be adjusted from x1 to x8 giving the user more variation in the timer settings There is also a ducting kit for applications where the effect is needed in an area away from the ZR12 F...

Page 5: ...ous and could cause damage to the machine Always check the voltage is correct for use with the machine the voltage setting is printed on the serial label Always read the user guide before operating the machine smoke machines need to be operated carefully to avoid risk Never touch the nozzle at the front of the machine the nozzle can stay hot for up to 10 hours Do not remove the cover or attempt to...

Page 6: ...uired This is done by using the JEM ducting adaptor and a length of 100 mm 4 ducting pipe The length can be anything from a couple of metres up to 20 metres or further There are one or two things to beware of when using smoke machines with ducting Firstly if there are bends to redirect the smoke they could cause condensation to form Also an air space must be provided between the output of the mach...

Page 7: ...t to the power supply and switch the mains switch on at the rear of the machine This will light when switched on now de press the grey stand by button the machine will now heat up which takes around 7 8 minutes While it heats up you should check the level in the fluid container the container can hold up to 2 5 litres of fluid NOTE Do not allow the to run out of fluid Serious damage may occur if th...

Page 8: ...urns the machines electronics on and off TIMER VALUE BUTTON When the timer is being used the timer values can be adjusted by a factor of 8 i e a 5 second minimum run time becomes 40 seconds a 10 second delay time becomes 1 minute 20 seconds TIMER ENGAGE This will engage the timer to fire the machine according to the present settings OUTPUT CONTROL Turning this knob clockwise will increase the outp...

Reviews: