Jema Autolifte – Denmark
- WE ARE HERE TO SURPRISE!
14
4.4 Operation
Raise the lift
1.
Make sure that you have read the operation manual before operation.
2.
Position the vehicle between columns.
3.
Adjust the swing lift arms so that the vehicle is positioned with the center of gravity of midway between pads
4.
Turn on the Power Switch, the power indicating light is on, raise the lift by pressing the up button on control box until the
pads touch firmly the right points and recheck if the vehicle is secure.
5.
Continue to press the UP button to raise the lift to the demanded height.
6.
Press the handle of the manual unloading valve to lock the lift
7.
Check the security of vehicle, and then turn off the power switch before performing maintenance or repair work.
Lower the lift
1. Turn on the power switch
2. Press the DOWN button on control box, the lift will raise about 5CM automatically to release the safety lock and then, the
lift lowers.
3. Before driving away the vehicle, clear all the obstacles.
4.5 Emergency lowering when the power is off
The carriage is not engaged:
a. Pull off the electromagnets on the two posts.
b. Loosen the electrical valve of the power unit to lower the carriage.
Summary of Contents for JA3500T
Page 20: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 20 ANNEX 2 Overall Diagram ...
Page 22: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 22 Annex5 Wiring diagram Single phase ...
Page 31: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 31 ...
Page 32: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 32 ...