Jema Autolifte – Denmark
- WE ARE HERE TO SURPRISE!
6
2.3 Construction of the lift
3. Installation instruction
3.1 Preparation before installation
3.1.1 Tools and equipments needed
Appropriate lifting equipment
AW 32. 46 or other good quality garage hydraulic oil.
Rotary Hammer Drill with 3/4’’ drill bit.
Chalk line and tape measure.
Sockets and Open wrench set.
Hammer 4pounds
Ф2 tape measure
3.1.2 Parts check ---annex 1
(
shipping sheet
)
Remove the packing material, identify the components and check for shortages as ANNEX 1(shipping sheet), Contact us
immediately if shortage discovered. If the buyer still installs the machine upon the shortage, the manufacturer and the dealer
will not hold any responsibility and will not solve the problems by free.
3.1.3 Space required
The lift should be located on a relatively level concrete floor, having minimum thickness of 18cm.
The lift should be fixed on a smooth and solid concrete ground with its strength more than 3000psi, tolerance of flatness less
tha
n 5mm and minimum thickness of 200mm. In addition, newly built concrete ground must undergo more than 28days’ cure
and reinforcement.
Summary of Contents for JA3500T
Page 20: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 20 ANNEX 2 Overall Diagram ...
Page 22: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 22 Annex5 Wiring diagram Single phase ...
Page 31: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 31 ...
Page 32: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 32 ...