16
Learning to Use the Lean Clean 360 Cleaning System
Installation and Setup
Introduction
Complete these steps to prepare the Lean Clean 360 for use:
Unpack the machine
Choose a location
Connect optional equipment
Connect power and utilities
Unpacking the Lean Clean 360
Your Lean Clean 360 should arrive shrink-wrapped and bolted
to a pallet. A heavy cardboard box covers the machine. Screws and strapping
hold the cardboard box in place.
Steps to Unpack the Machine
Remove the strapping and the cover of the cardboard box. Remove the
screws holding the cardboard box to the side of the pallet and remove the
cardboard box. Remove the bolts holding the Lean Clean 360 to the pallet.
Finally, and remove the 2x4 wooden lip on the pallet.
Remove the Lean Clean from the pallet using forklift with a 2,000 pound
lifting capacity. The Lean Clean’s bottom
frame includes forklift pockets to
make transportation of the machine convenient and safe.
Remove Documentation and Ancillary Parts
Documentation and some parts are stored in the wash tank for shipping.
After unpacking the machine, open the access panel to the right of the
electrical panel and remove the documentation and parts in the wash tank.
Occasionally documentation ships separately.
Large or sensitive optional equipment such as the optional oil separator or
ultrasonic generator are shipped in separate containers.