Section II: Operation
Page 44
5-376-000102
REV. 1 - 07/10
DOLLY OPERATION
(OPTIONAL)
Specifications:
Dolly Capacity: ................................................ 2,360 lbs.
Tire/Wheel: ............................................ 4.80 x 4.00/8Tire
Axle:
.................................................... 2 1/2 Sq. Tube
Max. Speed: .................................................... 50 M.P.H.
The Quick Loading Dolly is simple to use once the principles of the unit are
understood.
1.
Extend telescopic cross rails by first depressing spring-loaded
plunger and sliding inner (male) tube until plunger locks into the
hole that matches the width of vehicle to be towed.
2.
Place cross rails on ground, fore and aft of vehicle’s tires.
3.
Place dolly in the fully collapsed position with the dolly tires closest
to each other.
4.
Set rail ends into dolly pockets, adjusting for the size of vehicle’s
tires, positioning rails as close as possible to tires.
5.
Make sure safety locks are disengaged, allowing trip assemblies
freedom of movement while lifting vehicle.
6.
Engage ratchet assemblies to prevent injury and damage to the
operator and vehicle in case pry bar slips from hand.
7.
Insert pry bar into pry bar pocket.
8.
Swing outer end of pry bar in an arc until trip assembly rises then
locks spindle assembly in the down position.
Do not release pry
bar until spindle assembly is locked down.
9.
Repeat this action for all four (4) assemblies. Dolly is now raised.
10.
After dolly is in the raised position, engage safety locks over trip
assemblies to prevent releasing while vehicle is in tow.