Section II: Operation
Page 56
5-376-000086
REV. 4 - 07/10
26. Remove the pins from the hold
back bars at the rear of the body.
27. Swing the hold back bars in
toward the tow sling storage
brackets on the side of the boom.
Allow the hold back bars to
retract as necessary.
28. Connect the hold back bars to
the tow sling storage brackets
using the pins that you removed
earlier.
Summary of Contents for MPL40
Page 2: ...5 376 000086 REV 4 07 10 ...
Page 8: ...5 376 000086 REV 4 07 10 Page iv THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 26: ...Section I Safety Page 18 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ...Section II Operation Page 72 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...