39
SEMI-YEARLY INSPECTION
1. Exchange oil in headstock, feed gearbox and apron:
To drain and cleanup the mentioned oil reservoirs and
replenish with fresh recommend lubricating oil.
(Recommend an oil change within 3 months for new
machine)
2. Check the oil leakage: The oil reservoirs gaskets
(packing) may damaged and leaking, replace it.
3. Check and adjust the backlash: To examine the
backlash on cross slide, and the clearance on
leadscrew and other handwheels. To adjust and
tighten the relative screws or nuts according to the
instructions listed in the previous chapters.
4. Check the leveling : To examine the leveling by
adjusting and tighten the leveling screws.
5. Check the accuracy: To examine and adjust (if
necessary) the alignment, clearance etc., as the
accuracy test record accordingly.
6. Check the gears and bearings : The abnormal noise
may cause on worn gears and bearings, if necessary
replace it.
YEARLY INSPECTION
More carefully to do the semi-yearly inspections as the
above mentioned.
1. Repaint: After one-year operation, recommend
repainting the machine with the same color.
2. Check the exposed parts: Which may damaged,
corroded or deformed, to repair or replace it , if
necessary.