FIREBOX INSTALLATION
1. Locate and position firebox, fit and seal gather in cavity using fire cement (exhaust cement) and bolts (supplied), to
the firebox.
2. Note: Pop rivet back of gather to firebox if required (refer to Cross Section). Earthquake restraints may be
positioned by drilling through firebox into the floor protector, in a position midway beneath the log-pan. Two 6mm
dynabolts or similar will suffice. Do not over tighten and deform firebox.
2. Attach rock wool (supplied) to the sides of the firebox and gather (using fire cement).
3. DO NOT BLOCK OFF the air entry between the inner flue pipe and flue pipe casing or the air circulation between
the vent holes in the cavity.
3. Refer to Table 5, for minimum hearth sizes.
6.TMWG.11
FIREBOX INSTALLATION – GAS REQUIREMENTS
Please refer to the gas burner instructions supplied with the burner for full installation of the gas burner.
1 Before installing the fire box please drill a hole on the bottom right hand side of the fire box to allow for the gas pipe to
be connected to the burner.
2. Location of the hole should align with the gap between the gas grate’s supporting legs.
3. The gas supply pipe enters the firebox above the base plate to terminate under the gas burner where it can be
connected to the gas valve.
IMPORTANT : REMOVE THE DAMPER BLADE FROM THE FIREBOX
1. Unscrew the two friction bar adjustment nuts on the left hand side of the firebox and remove the friction bar.
2. To remove the Damper Blade, push the right hand side of the blade up and move the damper blade slightly to the
right to disengage the location bar on the left hand side of the damper blade, then slowly drop the blade down and
remove it.
IMPORTANT: GAS LEAKS
1. It is important to ensure that there are no gas leaks before commissioning the burner. It is the responsibility of the gas
installer to ensure that a leak testing method, suitable for the specific installation is being used.
2. Before commissioning, gas leaks can be detected only between the supply point and the inlet to the appliance. Once
the appliance is operational, an additional check must be done for leaks inside the appliance.
NOTE: GAS INSTALLATIONS
CAN NOT
BE
CONVERTED TO WOOD BURNING AT A LATER DATE