background image

Floor Protector

Fig. 9

Rock wool insulation 

(glue rock wool using fire 

cement to the firebox &

gather)

Hebel Block

Inner Leg Face

Gib Board

Non combustible material

(e.g Promatect H)

Heat 

Shield

A

(see Table 2)

C

(see Table 2)

min 2 x 80mm dia or equal square or rectangle 

shape area wall or floor mounted air vents

D

raw

ing

No

tTo

Sc

al

e

TIMBER FRAME PLAN

6.TMWG.7

100

Y

m

in

75

25

25

B

Fig.8

Flue Pipe Casing

S/S Flue Pipe

Heat Shield

Rock Wool 

Insulation

Note:

All external air vents 

& ceiling penetrations must 

be bird & rodent proofed 

with permanently fixed 

screens

Gib Board

Hebel Block

Non combustible material 

(eg. Promatect H)

Lintel Bar
Rock Wool insulation

(see Table 2)

Secure the firebox with 2 x

12mm Dynabolts in a midway 

position beneath the log pan

Rebate to suit tiles or other non com-

bustible material on Floor Protector

Maintain the air intake 

unobstructed

Floor Protector

see Table 5

It is important to ensure the Jetmaster firebox is seated at the 

required finished Floor Protector level

min 2 x 80mm dia 

or equal square or 

rectangle shaped air 

vents to be wall or

floor mounted

D

raw

ing

No

tTo

Sc

al

e

TIMBER FRAME CROSS SECTION

min 25mm from flue pipe casing to combustible material

Summary of Contents for 700

Page 1: ...warranty Due to continued product improvement The Fireplace Ltd reserves the right to change product specifications without prior notification Please check to ensure you have the latest installation...

Page 2: ...hield Firebox Installation Gas Requirements Plan Section Drawing Plan Section Recessed Drawing Masonry Cavity Dimensions Solid Fuel Flue Installation Gas Flue Installation Flue Penetration Chimney Cha...

Page 3: ...IN HEATER INSTALLATION CLEARANCES WHEN OPERATING THIS APPLIANCE AS AN OPEN FIRE USE A FIRE SCREEN THIS APPLIANCE SHOULD BE MAINTAINED AND OPERATED AT ALL TIMES IN ACCORDANCE WITH THESE INSTRUCTIONS US...

Page 4: ...ather available 1050IGC Box is ONLY for gas installations MODEL A A1 A2 B C D E F Y Off set Gather Indoor Gas Burner 700 700 800 750 400 700 225 325 200 680 295 395 Yes 850 850 950 900 450 700 250 350...

Page 5: ...ensure allowance is made to place non combustible internal wall lining eg Promatect H to cover the extent of the Hebel panel surround shown shaded Directly touching the firebox with any board or plas...

Page 6: ...r entry between the inner flue pipe and flue pipe casing or the air circulation between the vent holes in the cavity 7 Once the flue system is installed place a minimum 300mm hebel block over the top...

Page 7: ...ns must be bird rodent proofed with permanently fixed screens Gib Board Hebel Block Non combustible material eg Promatect H Lintel Bar Rock Wool insulation see Table 2 Secure the firebox with 2 x 12mm...

Page 8: ...x with 2 x12mm dynabolts for earthquake retraints Maintain the air intake unobstructed Floor Protector Fig 10 Fig 11 B see Table 2 Note All external air vents ceiling penetrations must be bird rodent...

Page 9: ...Floor Protector dimension RECESS REQUIRED 40mm Min 100mm Max Allow gas line into firebox if applicable Air Vent Y Refer toTable 2 for Floor Protector dimension Air Vent min 2 x 100 x 50mm or 80mm diam...

Page 10: ...side wall space make allowance min 2 x 80mm diameter or equivalent at the top of the chimney chase Pg 14 Ensure vents are bird and vermin proofed CROSS SECTION CAVITY PREPARATION 6 TMWG 10 Drawing No...

Page 11: ...pipe to be connected to the burner 2 Location of the hole should align with the gap between the gas grate s supporting legs 3 The gas supply pipe enters the firebox above the base plate to terminate u...

Page 12: ...ver spigot when fitted sizing measuring and cutting down should be carried out prior to the flue pipe casing being fitted over the flue pipe 2 Before fitting casing cover place the spider in oppositio...

Page 13: ...out prior to the flue pipe casing being fitted over the flue pipe 7 Before fitting casing cover place the spider in opposition with the spider post facing down between the flue pipe and flue pipe casi...

Page 14: ...r rectangle shaped area min 25mm gap between flue pipe casing combustible surface EXTERNAL REQUIREMENTS SOLID FUEL Refer to AS NZS2918 2001 4 9 1 Note All external air vents ceiling penetrations must...

Page 15: ...75 850 250 350 400 400 1050 IGC 250 300 350 350 1050 300 400 450 450 1200 400 500 550 550 1500 450 550 600 600 Table 4 CHIMNEY CHASE MINIMUM TRIM OUT 6 TMWG 15 MODEL A B C GAS B 700 1100 400 75 8 300...

Page 16: ...fer below for air vent sizing and suggested location Fig 26 Location points A B C D are suggested combinations A minimum of one pair of air vents is recommended or one large vent as per location point...

Page 17: ...tructed of combustible material it must be located within the shaded area defined in Fig 28 Fig 28 Projection mm Combustible Materials Non Combustible Materials CLEARANCE TO COMBUSTIBLE MANTELS 6 TMWG...

Reviews: