background image

JETMASTER (VIC) Pty Ltd

ACN 005 872 159   ABN13 659 821 337

444 Swan Street Richmond 3121

Phone: (03) 9429 5573  Fax: (03) 9427 0031

Email: info@jetmastervic.com.au  Web: www.jetmastervic.com.au

V-JOINT TO PLASTERBOARD & WHITE INSULATION BOARD, BUTT JOIN EACH AND BACK FILL WITH BASE COAT. 
OVERLAY JOIN WITH FIBREGLASS TAPE AS FIRST JOINT, THEN TROWEL BASE AND TOP COAT OVER. 

NOTE

 - Unit must be installed (and gas connected) prior to plaster sheeting.

•   Position unit into framed opening with minimum clearances as per specifications on following pages. Frame opening 

height is from the bottom of unit. This unit is designed to be raised from the floor.

•   Run flues in accordance with the options in the installation manual.
•   Butt join plasterboard and white insulation board at top of heater. USING ONLY FIBREGLASS TAPE finish insulation 

board to plasterboard as per normal plasterboard procedures. Ensure that top coat finish extends down to top of 

heater, as indicated in diagram below. Insulation board will remain exposed as part of the finished plaster face.

•   Unit should always be operated with External Fan in the ON position. Failure to run the fan may result in hairline cracks 

appearing in the plaster above the unit.

Owner’s Manual

Care and Operation

H t & Gl MEZZO 1000 AU MEZZO 1300 AU MEZZO 1300ST AU MEZZO 1600 AU O

’ M

l 2304 971 R C 3/15

ADDENDUM

PLEASE NO

TE

ON THE FOLLOWING MODELS:

MEZZO-1000-AU / MEZZO-1300-AU / MEZZO-1600-AU

1. FANS MUST BE RUN AT ALL TIMES!

2.

RUNNING HEAT ZONE FANS IS

OPTIONAL

Owner’s Manual

Care and Operation

H t & Gl MEZZO 1000 AU MEZZO 1300 AU MEZZO 1300ST AU MEZZO 1600 AU O

’ M

l 2304 971 R C 3/15

ADDENDUM

PLEASE NO

TE

ON THE FOLLOWING MODELS:

MEZZO-1000-AU / MEZZO-1300-AU / MEZZO-1600-AU

1. FANS MUST BE RUN AT ALL TIMES!

2.

RUNNING HEAT ZONE FANS IS

OPTIONAL

JM-155 (10/15)

Summary of Contents for HEAT & GLO MEZZO-AU

Page 1: ...ASS TAPE finish insulation board to plasterboard as per normal plasterboard procedures Ensure that top coat finish extends down to top of heater as indicated in diagram below Insulation board will remain exposed as part of the finished plaster face Unit should always be operated with External Fan in the ON position Failure to run the fan may result in hairline cracks appearing in the plaster above...

Page 2: ...board It is imperative that these points are followed to ensure the continuity of the product finish JM 155 10 15 INSTALLATION MEZZO AU 2304 970 Rev D 3 15 NOTE Important information regarding Mezzo installation Please be advised of the following MUST DO items concerning Mezzo appliance setup for installers Mezzo fireplaces must ALWAYS be run with the fan s operating Retaining brackets for glass r...

Page 3: ...board It is imperative that these points are followed to ensure the continuity of the product finish JM 155 10 15 INSTALLATION MEZZO AU 2304 970 Rev D 3 15 NOTE Important information regarding Mezzo installation Please be advised of the following MUST DO items concerning Mezzo appliance setup for installers Mezzo fireplaces must ALWAYS be run with the fan s operating Retaining brackets for glass r...

Page 4: ...ASS TAPE finish insulation board to plasterboard as per normal plasterboard procedures Ensure that top coat finish extends down to top of heater as indicated in diagram below Insulation board will remain exposed as part of the finished plaster face Unit should always be operated with External Fan in the ON position Failure to run the fan may result in hairline cracks appearing in the plaster above...

Reviews: