12
1.2
Handlebar Assembly
1. USING THE SCREWDRIVER TIP OF THE 2-BIT TOOL, UNSCREW THE PRE-ATTACHED BOLT AND NUT FROM THE BASE OF
THE HANDLEBAR.
2. SLIDE THE HANDLEBAR ONTO THE SCOOTER STEM.
3. PUSH DOWN AND ADJUST UNTIL THE HOLES IN THE HANDLEBAR BASE ARE ALIGNED WITH THE HOLES IN THE STEM.
4. FROM THE RIGHT SIDE WHEN STANDING ON THE SCOOTER, INSERT THE BOLT THROUGH ALL FOUR HOLES.
TIGHTEN WITH THE SCREWDRIVER.
IMPORTANT: PLACE THE BOLT ON THE RIGHT SIDE WHEN FACING THE FRONT OF THE SCOOTER FROM RIDING POSITION.
PLEASE MAKE SURE THAT THE BOLT AND NUT ARE SECURED AND TIGHTENED PRIOR TO RIDING.
NUT
BOLT
HANDLEBAR HOLES
Summary of Contents for JPRNS-2KIK
Page 2: ......
Page 3: ...Jetson stoptworidingrules Besafe Havefun ...
Page 4: ......
Page 9: ...7 1 3 12 4 7 8 9 10 11 5 2 NOTE IMAGES MAY NOT REFLECT EXACT APPEARANCE OF ACTUAL PRODUCT 6 ...
Page 11: ...9 KNOB 1 1 Unfolding FoldingtheScooter 1 GettingStarted 1 LOOSEN THE KNOB ...
Page 12: ...10 LOCKING LEVER 2 OPEN THE LOCKING LEVER LOCATED ON THE OPPOSITE SIDE OF THE KNOB ...