Operation Manual
Installation
1. Place the valve into position on the mani-
fold. Using the palms of your hands, press
the valve into the manifold as shown in
2. Install the remaining valves.
3. Swing the manifold upward to install the
bolts.
4. Install the manifold bolts and tighten in
a crisscross sequence starting with the
center bolts (Figure 106). Proper torque is
350 ft.-lb. (470 N·m).
5. Connect the water lubrication lines (Fig-
) to the stuffing boxes and close
the rod box cover.
6. Connect the supply coupling (Figure 108)
and the bypass hose to the manifold.
Figure 106: Tightening Sequence.
Cover
Lubrication
Lines
Figure 107: Connecting the Water Lubrication Lines.
Bypass Hose
Supply Coupling
Figure 108: Hose Connections.
Figure 105: Installing the Valves.
Valve
Summary of Contents for TwinForce Series
Page 1: ...OPERATION MANUAL TwinForce Series Waterblast Unit...
Page 2: ...Visual Safety System...
Page 11: ...3 TwinForce Series Waterblast Unit...
Page 22: ...14 Operation Manual...
Page 42: ...34 Operation Manual...
Page 48: ...40 Operation Manual...
Page 52: ...44 Operation Manual...
Page 100: ...92 Operation Manual...
Page 104: ...96 Operation Manual...
Page 106: ...A 2 Appendix A Technical Specifications...
Page 107: ...B 1 TwinForce Series Waterblast Unit APPENDIX B LONG TERM STORAGE PROCEDURE...