Note:
The respective local and national regulations and conditions must always
be observed.
1
2
3
PE
Netz/Line
Last/Load
5
6
7
Fig. 3.7 Connection of the JM-3000 system with double PE cables
1) JSC-3000 safety controller
2) Supply unit
3)
Servo amplifiers
5) Line reactor
6) Line filter
7) Double ground connection
CAUtIoN
The protective conductor connection is a safety feature. Therefore, make
sure that all connections have good contact and are so tight that they can-
not become loose by themselves.
A wiring diagram of the axis system, from which you can also find detailed
information on the protective conductor connections, can be found in chap-
Jetter AG
51
JetMove 3000
Electrical installation