68
Instructions Manual
4. Preparation
C
5.
Insert the kernel processor (E) through
the cover opening, placing it on the rotor;
6.
With your hands, rotate the rotor, lowering
the kernel breaker to the working position;
7.
Fix the grain processor with the screws
and nuts (C);
8.
Replace the cover (B) and secure it with the
four screws, nuts and washers (A).
E
A
A
B
NOTE!
To maintain efficiency in breaking
of the grains, periodically clean the
processor.
Summary of Contents for 1600-AT S3
Page 2: ......
Page 3: ...JF 1600 AT S3 COSECHADORA DE PRECISIÓN MULTIFORRAJE ESPAÑOL ...
Page 4: ...ESPAÑOL ...
Page 113: ...Manual de Instrucciones 113 9 Especificaciones ESPAÑOL 9 4 Tabla de medidas de llaves ...
Page 115: ...Manual de Instrucciones 115 9 Especificaciones ESQUEMA HIDRAULICO A B ESPAÑOL ...
Page 118: ...118 Manual de Instrucciones ...
Page 119: ...Manual de Instrucciones 119 ESPAÑOL ...
Page 120: ...120 Manual de Instrucciones ...
Page 121: ...JF 1600 AT S3 MULTI FORAGE PRECISION HARVESTER ENGLISH ENGLISH ...
Page 122: ...ENGLISH ...
Page 230: ...110 Instructions Manual 9 Specifications 9 3 Bolt torque table Torque unit N m ...
Page 231: ...Instructions Manual 111 9 Specifications ENGLISH 9 4 Gauge keys table ...
Page 233: ...Instructions Manual 113 9 Specifications HYDRAULIC SCHEME A B ENGLISH ...
Page 236: ...116 Instructions Manual ...
Page 237: ...Instructions Manual 117 ENGLISH ...
Page 238: ...118 Instructions Manual ...
Page 239: ......