9
8
SRP-14-GB(V3)
Step3.
INSTALL HORIZONTAL BEAM
Slide combined beams into sleeve,the hole on the beams should face outwards.
PART4-SET UP THE POOL
Step1. ACCOUNT FOR ALL PARTS.
Remove all the parts from the carton(s) and place them on the ground in the location where they are to be assembled
Check each part according to “PART REFERENCE” .Make sure all the pieces to be assembled are accounted for.
IMPORTANT:
Do not start assembly if any pieces are missing. For replacement pieces call the Consumer Service
telephone number in your area.
The number of persons required for installation: 2 adult at least.
Total installation time except the time for site preparation and water filling :
45 minutes for size 10’×6.8'×27.6"/13'×6.8'×31.5"; 30 minutes for size 8.5’×6’×26”/74”×50”×16.5”/90”×62.6”×16.5”.
Step2. INSTALL DRAIN VALVES COVER AND STOPPER
Make sure that outer drain plug is inserted into the outer drain cap and drain valve cover is screwed on tightly.Plug the con-
nection holes with the stoppers. (The out drain plug changes according to different size of pool.)
STOPPER
Out Drain Plug A
Out Drain Plug B
Drain Vavle Cover
BEAM A
BEAM A
BEAM B
For 10’x6,8’x27,6” (3mx2.07mx70 cm) and 8,5’x6’x26” (2.58mx1.79mx66 cm), the combination is A-A-B.
BEAM A
BEAM B
For 74”x50”x16,5”(1.88mx1.27mx42 cm) and 90”x62,6”x16,5”(2.28mx1.59mx42 cm) , the combination is A-B.
BEAM C
For 74”x50”x16,5”(1.88mx1.27mx42 cm) , the short side is C.
BEAM A
For 13’x6,8’x31,5” (3.94mx2.07mx80 cm), the combination is A-A-A-B.
For the short side sleeve of the pool:
For the long side sleeve of the pool:
BEAM A
BEAM C
BEAM B
BEAM D
For 10’x6,8’x27,6” (3mx2.07mx70 cm) and 13’x6,8’x31,5”
(3.94mx2.07mx80 cm), the combination is A-B.
For 8,5’x6’x26” (2.58mx1.79mx66 cm)and
90”x62,6”x16,5”(2.28mx1.59mx42 cm), the combination is C-D.
BEAM A
BEAM A
BEAM B