5. SYSTEM SETUP
- Put the CICLON LS in the desired place and connect the inlets and outlet. (See connection diagram
on page 13). Leave a minimum distance of a meter from the downpipe to the lifting station, so that
this works for an adequate length of time.
- Bring the desired connecting pipes to the lifting station, remove the necessary flat caps and connect
the smooth pipe to the side and top inlets, affix-
ing the 40 mm (1
½
”) pipe using the nut and
conical joint supplied.
- The lifting station is supplied with 3 non-return
valves, which we recommend be installed in the
lower side inlets and, if necessary, in the upper
side inlet. A non-return discharge valve is also
supplied and this must always be installed in
the outlet of the lifting station.
- Additionally, if necessary, they can be installed in
the top inlets (non-return valves not supplied).
- The unit receives water from the connected sani-
tary fixtures by means of gravity. The sections
towards the unit must have a vertical lift that
allows drainage when the pump has stopped.
- When a shower basin is connected, a minimum
height of 180 mm between the lowest part of
the shower basin and the base of the lifting
station must be allowed for when installing it, in
order to provide enough of a height difference
towards the drainage inlets.
- The use of non-siphoned outflows is recom-
mended for the installation of shower basins or
bathtubs (see connection recommendations on
page 13 for the installation of a secondary
ventilation system if this is not possible).
- The CICLON LS lifting station has a female Ø32
mm PVC connection, provided with a non-return
valve. In case of an obstruction, it is recom-
mended that a stopcock be installed in the verti-
cal discharge pipe that stops it from emptying.
- Connect the drainage pipe and the downpipe.
The lifting station propels, through the Ø 32 mm
drainage pipe, up to a maximum height of 7 m
or as far as a horizontal distance of 72 m, or a combination of the two (see diagram). A constant mini-
mum slope of 1% must always be maintained as far as the discharge point.
- In combined installations (vertical and horizontal) it must be kept in mind that a 1 metre vertical lift is
approximately the equivalent of a 10 metre horizontal stretch.
- All those installations that must be lifted vertically must have this lift carried out directly over the lifting
station. The installation of bends or directional changes creates a loss of load that must be subtracted
from the maximum pumping distances (reduce approx. 1 m from the maximum distance for each bend).
6 - MODE D’EMPLOI ET ENTRETIEN
LIFTING STATION EB-705
English
1
2
VOLUME MNIMO FREES FOR
DISASSEMBLING CASETE