This document is only for internal use of JINNENG CLEAN ENERGY TECHNOLOGY LTD, and shall not be published or
copied without permission of the company.
JNMM108-XXX
+5400Pa/-2400Pa
+2400Pa/-2400Pa
JNMM144-XXX
/
+5400Pa/-2400Pa
JNBM144-XXX
/
+5400Pa/-2400Pa
Table 6
4
)
210 Module
Screw installation method
Installation of cross beam through long side outer four hole bolt
Static load
(
Test load
)
Installation Method
Module Type
Installation of cross beam through long
side outer four hole bolt
JNMM120-XXX
+5400Pa/-2400Pa
JNBM120-XXX
+5400Pa/-2400Pa
JNMM132-XXX
+5400Pa/-2400Pa
JNBM132-XXX
+5400Pa/-2400Pa
Table 7
Bolts are inserted as described in the process below (Fig. a).
1. Place the module on the supporting bars underneath (The modules should directly touch with the
supporting bar).Insert
the four
stainless-steel bolts (M8) through the holes in the frame.
Components must be laid across support rods (40mm to 80mm in width).
2. Secure each bolt to the frame with 2 stainless-steel washers, one on each side of the mounting
structure; and screw on either a stainless-steel spring washer or a toothed lock washer. Finally,
secure with a stainless steel nut (M8).
Fig. a