JKDC SECURITY Co Limited
www.jkdcsecurity.com
5
Wiring Diagram:
8. Work to be Carried out by the Customer: (Installation Diagram Attached)
Single-Phase 5A 220V power supply, grounded to the connecting line of the control equipment.
(Connect the controllers
’
dry contact (or level) control signal to PASS1 or PASS2) or (Connect
DC12V output to DOOR1, DOOR2 terminals).
Installation:
1) Civil Engineering Works:
Use GB (Chinese Standard) 405# Portland cement concrete to build foundation with thickness
from 10CM to 15CM. The installation can be carried out five to seven days after the concrete
foundation is built.
2) Fixation
Use the key to open the turnstile base plate and there are four 12mm holes inside the base. Use
four 8mm*10mm expansion anchor bolts to fix the base.
3) Installation Dimensions: (Refer to the following diagrams)
Connecting DC24V
Legal Signal Input
Terminal (Dry Contact) 1
Legal Signal Input
Terminal (Dry Contact) 2
Illegal Card Use Input
Terminal 1
Illegal Card Use Input
Terminal 2
Travel Switch Reset 1
Travel Switch Reset 2
Legal Signal Input
Terminal (DC12V) 1
Legal Signal Input
Terminal (DC12V) 2
Connecting 2 way
Electromagnet
Connecting DC24V
Connecting 1 way
Electromagnet
Legal Card Use (LED) Output
Terminal 1
Legal Card Use (LED) Output
Terminal 2
Illegal Card Use (LED) Output
Terminal 1
Illegal Card Use (LED) Output
Terminal 2
Test Button 1
Test Button 2
Output 2
24V Input
NC
Output 1