SECTION 4 - BASE COMPONENTS
4-28
– JLG Lift –
3121222
Motor Assembly
Motor Assembly
1.
Insert motor (13) into back of the gearbox. Motor will pilot on the 4 bosses in the gearbox. Try to keep the
end of the motor shaft from causing damage to the lip seal in the gearbox.
NOTE:
The motor may need to be rotated to line up the sun gear splines with the motor shaft splines.
2.
Install the 2 Motor Mounting Bolts (M7) and Washers (M8). Tighten to 9-11 ft-lbs.
3.
Connect the end of the power cable to the power controller, route cable per instruction in Figure 4-3.
4.
Fill the gearbox with oil, See Oil Type & Capacity on Page 4-12.
Summary of Contents for 1230ES
Page 1: ...AS NZS Service and Maintenance Manual Model s 1230ES P N 3121222 June 22 2017 ...
Page 2: ...NOTES ...
Page 24: ...SECTION 1 MACHINE SPECIFICATIONS 1 12 JLG Lift 3121222 NOTES ...
Page 32: ...SECTION 2 GENERAL SERVICE INFORMATION 2 8 JLG Lift 3121222 NOTES ...
Page 78: ...SECTION 4 BASE COMPONENTS 4 40 JLG Lift 3121222 NOTES ...
Page 104: ...SECTION 5 CONTROL COMPONENTS 5 26 JLG Lift 3121222 NOTES ...
Page 158: ...SECTION 8 DIAGNOSTIC TROUBLE CODES 8 22 JLG Lift 3121222 NOTES ...
Page 198: ...SECTION 9 GENERAL ELECTRICAL INFORMATION SCHEMATICS 9 40 JLG Lift 3121222 ...
Page 199: ...SECTION 9 GENERAL ELECTRICAL INFORMATION SCHEMATICS 3121222 JLG Lift 9 41 ...
Page 200: ...SECTION 9 GENERAL ELECTRICAL INFORMATION SCHEMATICS 9 42 JLG Lift 3121222 ...
Page 202: ...SECTION 9 GENERAL ELECTRICAL INFORMATION SCHEMATICS 9 44 JLG Lift 3121222 NOTES ...