SECTION 4 - BASE COMPONENTS
3121222
– JLG Lift –
4-19
Input Carrier Disassembly
Input Carrier Disassembly
1.
Remove Retaining Rings (18) from each of the three Planet Shafts (6).
NOTE:
Do not overstress these Retaining Rings when removing them.
2.
Remove Thrust Plate (23).
3.
Remove Thrust Washer (25) from each Planet Shaft (6).
4.
Slide each Input Planet Gear (5) off the Planet Shaft (6).
5.
Press out Bushing (26) from the bore of each Planet Gear (5). Bushings cannot be reused when removed.
6.
Remove the other Thrust Washer (25) from each Planet Shaft (6).
7.
Remove Retaining Ring (24) from Output Sun Gear (8).
8.
Slide Output Sun Gear (8) out from the center of the Input Carrier (7).
9.
Remove the three Planet Shafts (6) from the Input Carrier.
NOTE:
The Planet Shafts (6) are held in with a press fit. To avoid damage to the parts, use an arbor or hydraulic press to
remove the Planet Shafts (6).
Summary of Contents for 1230ES
Page 1: ...AS NZS Service and Maintenance Manual Model s 1230ES P N 3121222 June 22 2017 ...
Page 2: ...NOTES ...
Page 24: ...SECTION 1 MACHINE SPECIFICATIONS 1 12 JLG Lift 3121222 NOTES ...
Page 32: ...SECTION 2 GENERAL SERVICE INFORMATION 2 8 JLG Lift 3121222 NOTES ...
Page 78: ...SECTION 4 BASE COMPONENTS 4 40 JLG Lift 3121222 NOTES ...
Page 104: ...SECTION 5 CONTROL COMPONENTS 5 26 JLG Lift 3121222 NOTES ...
Page 158: ...SECTION 8 DIAGNOSTIC TROUBLE CODES 8 22 JLG Lift 3121222 NOTES ...
Page 198: ...SECTION 9 GENERAL ELECTRICAL INFORMATION SCHEMATICS 9 40 JLG Lift 3121222 ...
Page 199: ...SECTION 9 GENERAL ELECTRICAL INFORMATION SCHEMATICS 3121222 JLG Lift 9 41 ...
Page 200: ...SECTION 9 GENERAL ELECTRICAL INFORMATION SCHEMATICS 9 42 JLG Lift 3121222 ...
Page 202: ...SECTION 9 GENERAL ELECTRICAL INFORMATION SCHEMATICS 9 44 JLG Lift 3121222 NOTES ...