SECTION 3 - MACHINE CONTROLS AND INDICATORS
3121261
– JLG Lift –
3-7
10.
Lift Control
Provides raising and lowering
of the main boom.
11.
Swing Control
Provides 360 degrees contin-
uous turntable rotation.
12.
Main Telescope Control
Provides extension and
retraction of the main boom.
13.
Boom Control System Test
Button
The push button is used to test the
boom control system and confirm
that it is working properly.
14.
Machine Safety System Override (MSSO) (CE
Only)
Provides emergency override of function
controls that are locked out in the event of
Load Sense System activation.
Summary of Contents for 1500SJ
Page 2: ......
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 JLG Lift 3121261 NOTES ...
Page 68: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 24 JLG Lift 3121261 NOTES ...
Page 100: ...SECTION 4 MACHINE OPERATION 4 32 JLG Lift 3121261 NOTES ...
Page 143: ...SECTION 5 LCD DISPLAY PANEL GENERATION 1 2 3121261 JLG Lift 5 43 Figure 5 29 BCS Lamp Screen ...
Page 149: ...SECTION 5 LCD DISPLAY PANEL GENERATION 1 2 3121261 JLG Lift 5 49 Figure 5 34 Swing DTC Screen ...
Page 166: ...SECTION 6 EMERGENCY PROCEDURES 6 4 JLG Lift 3121261 NOTES ...
Page 180: ...SECTION 7 ACCESSORIES 7 14 JLG Lift 3121261 NOTES ...
Page 208: ...SECTION 8 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 8 28 JLG Lift 3121261 NOTES ...
Page 212: ......
Page 213: ......