SECTION 4 - BOOM & PLATFORM
3121619
4-33
33.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the rear upper wear pads to section 3 using wash-
ers, bolts, and shims. Torque the bolts to 28 ft.lbs. (38
Nm).
34.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the outer rear side wear pads to section 3 using
washers, bolts, and shims. Torque the bolts to 28 ft.lbs.
(38 Nm).
35.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the rear inner side wear pads to section 3 using
washers, and bolts. Torque the bolts to 28 ft.lbs. (38 Nm)
36.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the bottom rear wear pad to section 3 using
washers and bolts. Torque the bolts to 28 ft.lbs. (38 Nm).
37.
Apply moly paste to the I.D. of the sheave bearings.
Install the sheaves to section 3.
38.
Coat the two sheave center bolts with JLG Threadlocker
P/N 0100019 and the sheave plate retaining bolts with
JLG Threadlocker P/N 0100011. Install the sheave plates
and rope retainer blocks to section 3 using the retaining
bolts. Torque the sheave center bolts to 178 ft.lbs. (241
Nm). Torque the sheave plate retaining bolts to 41 ft.lbs.
(55 Nm)
39.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the section 3 retract ropes to the rear of section 3
using washers, bolts, and pads. Torque the bolts to 28
ft.lbs. (38 Nm).
NOTE:
Boom section 2 weighs approximately 3755 lbs. (1703 kg).
40.
Place boom section 2 on a proper supporting device.
41.
Apply Super Lube® lubricant (JLG p/n 3020042) to all 4
sides of the boom approximately 3 to 4 feet on both
ends. Apply Super Lube® to section 3 on the end that
will go into section 2 only. Apply super lube to all outer
surfaces of interior wear pads after they are installed.
Slide sections 3,4, and 5 as an assembly into section 2
using proper lifting procedures.
42.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the wear pads to section 2 using the bolts and
washers. Torque the bolts to 43 ft.lbs. (58 Nm).
43.
Install the adjustment nuts and lock nuts to the section
4 extend ropes.
44.
Install the rope adjustment bracket to section 2 using
washers, bolts, and nuts as shown.
45.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the section 4 return ropes to the rope adjustment
bracket on section 2 using washers, bolts, keepers, and
nuts.
46.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the sheave deflectors to the rope adjustment
bracket on section 2 using nuts, bolts, and washers.
47.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the front side wear pads to section 2 using wash-
ers, bolts, and shims. Torque the bolts to 28 ft.lbs. (38
Nm)
48.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install front top wear pads to section 2 using washers,
bolts, and shims. Torque the bolts to 28 ft.lbs. (38 Nm)
49.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the rear top wear pads to section 3 using washers,
bolts, and shims. Torque the bolts to 28 ft.lbs. (38 Nm).
50.
Coat the bolts with JLG Threadlocker P/N 0100011.
Install the rear side wear pads to section 2 using wash-
ers, bolts, and shims. Torque to 28 ft.lbs. (38 Nm).
Summary of Contents for 1850SJ
Page 1: ...Service and Maintenance Manual Model 1850SJ 3121619 June 29 2018 Rev J AS NZS...
Page 2: ......
Page 21: ...3121619 xvii LIST OF FIGURES FIGURE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 24: ...xx 3121619 LIST OF TABLES TABLE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 50: ...SECTION 2 GENERAL 2 12 3121619 NOTES...
Page 55: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 5 This page left blank intentionally...
Page 56: ...SECTION 3 CHASSIS TURNTABLE 3 6 3121619 Figure 3 4 Axle Hose Routing Sheet 1 of 2...
Page 57: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 7 Figure 3 5 Axle Hose Routing Sheet 2 of 2...
Page 58: ...SECTION 3 CHASSIS TURNTABLE 3 8 3121619 Figure 3 6 Steering Axle Hydraulic Circuit...
Page 61: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 11 Figure 3 9 Turntable Hydraulic System...
Page 92: ...SECTION 3 CHASSIS TURNTABLE 3 42 3121619 Figure 3 39 Swing Bearing Wear Tolerance...
Page 94: ...SECTION 3 CHASSIS TURNTABLE 3 44 3121619 Figure 3 41 Swing Bearing Removal Sheet 2 of 4...
Page 110: ...SECTION 3 CHASSIS TURNTABLE 3 60 3121619 Figure 3 54 Engine Electrical Circuit...
Page 169: ...SECTION 4 BOOM PLATFORM 3121619 4 7 Figure 4 1 Boom Hydraulic System...
Page 173: ...SECTION 4 BOOM PLATFORM 3121619 4 11 Figure 4 2 Boom Assembly Sheet 1 of 9...
Page 174: ...SECTION 4 BOOM PLATFORM 4 12 3121619 Figure 4 3 Boom Assembly Sheet 2 of 9...
Page 175: ...SECTION 4 BOOM PLATFORM 3121619 4 13 Figure 4 4 Boom Assembly Sheet 3 of 9...
Page 176: ...SECTION 4 BOOM PLATFORM 4 14 3121619 Figure 4 5 Boom Assembly Sheet 4 of 9...
Page 177: ...SECTION 4 BOOM PLATFORM 3121619 4 15 Figure 4 6 Boom Assembly Sheet 5 of 9...
Page 178: ...SECTION 4 BOOM PLATFORM 4 16 3121619 Figure 4 7 Boom Assembly Sheet 6 of 9...
Page 179: ...SECTION 4 BOOM PLATFORM 3121619 4 17 Figure 4 8 Boom Assembly Sheet 7 of 9...
Page 180: ...SECTION 4 BOOM PLATFORM 4 18 3121619 Figure 4 9 Boom Assembly Sheet 8 of 9...
Page 181: ...SECTION 4 BOOM PLATFORM 3121619 4 19 Figure 4 10 Boom Assembly Sheet 9 of 9...
Page 187: ...SECTION 4 BOOM PLATFORM 3121619 4 25 Figure 4 16 Boom Assembly Torque Values Sheet 1 of 4...
Page 188: ...SECTION 4 BOOM PLATFORM 4 26 3121619 Figure 4 17 Boom Assembly Torque Values Sheet 2 of 4...
Page 189: ...SECTION 4 BOOM PLATFORM 3121619 4 27 Figure 4 18 Boom Assembly Torque Values Sheet 3 of 4...
Page 190: ...SECTION 4 BOOM PLATFORM 4 28 3121619 Figure 4 19 Boom Assembly Torque Values Sheet 4 of 4...
Page 201: ...SECTION 4 BOOM PLATFORM 3121619 4 39 Figure 4 20 Hose Adjustment...
Page 202: ...SECTION 4 BOOM PLATFORM 4 40 3121619 Figure 4 21 Section 3 Boom Cables...
Page 203: ...SECTION 4 BOOM PLATFORM 3121619 4 41 Figure 4 22 Section 4 Boom Cables...
Page 204: ...SECTION 4 BOOM PLATFORM 4 42 3121619 Figure 4 23 Section 5 Boom Cables...
Page 205: ...SECTION 4 BOOM PLATFORM 3121619 4 43 Figure 4 24 Jib Hydraulics Sheet 1 of 7...
Page 234: ...SECTION 4 BOOM PLATFORM 4 72 3121619 Figure 4 44 Powertrack Shimming Instructions...
Page 239: ...SECTION 4 BOOM PLATFORM 3121619 4 77 Figure 4 49 Powertrack Hose Installation Sheet 1 of 4...
Page 240: ...SECTION 4 BOOM PLATFORM 4 78 3121619 Figure 4 50 Powertrack Hose Installation Sheet 2 of 4...
Page 241: ...SECTION 4 BOOM PLATFORM 3121619 4 79 Figure 4 51 Powertrack Hose Installation Sheet 3 of 4...
Page 242: ...SECTION 4 BOOM PLATFORM 4 80 3121619 Figure 4 52 Powertrack Hose Installation Sheet 4 of 4...
Page 252: ...SECTION 4 BOOM PLATFORM 4 90 3121619 NOTES...
Page 432: ...SECTION 5 BASIC HYDRAULIC INFORMATION HYDRAULIC SCHEMATICS 5 180 3121619 NOTES...
Page 527: ...SECTION 6 JLG CONTROL SYSTEM 3121619 6 95 Figure 6 36 LSS Installation Sheet 1 of 4...
Page 528: ...SECTION 6 JLG CONTROL SYSTEM 6 96 3121619 Figure 6 37 LSS Installation Sheet 2 of 4...
Page 529: ...SECTION 6 JLG CONTROL SYSTEM 3121619 6 97 Figure 6 38 LSS Installation Sheet 3 of 4...
Page 530: ...SECTION 6 JLG CONTROL SYSTEM 6 98 3121619 Figure 6 39 LSS Installation Sheet 4 of 4...
Page 710: ...SECTION 7 BASIC ELECTRICAL INFORMATION ELECTRICAL SCHEMATICS 7 118 3121619 NOTES...