SECTION 4 - BOOM & PLATFORM
3121619
4-37
9.
Repeat steps 1-7 above to install the Section 5/4 assem-
bly into boom Section 3.
10.
Repeat steps 1-7 above to assemble the Section 5/4/3
assembly into Section 2.
11.
Repeat steps 1-7 above to assemble the Section 5/4/3/2
assembly into Section 1.
12.
Complete the boom and machine assembly. The boom
should be functionally tested and evaluated for boom
sweep. If necessary, the boom may be re-shimmed by
moving shims from one side to the other to further cor-
rect any remaining boom sweep. There may be some
instances where no shims are used under a given side
pad to pass the criteria for boom sweep at final inspec-
tion of machine.
4.6
BOOM LUBRICATION APPLICATION
This procedure applies to booms after assembly or as neces-
sary using Super Lube® lubricant (JLG p/n 3020042).
NOTE:
This procedure should also be performed when the tele-
scope in or telescope out functions are not operating
smoothly.
1.
Position the boom on the boom rest using the 500lb
capacity setting.
2.
Telescope main boom section as far as it will extend at
this position, approximately 3 ft. (0.9 m).
3.
From the front of the machine (boom pivot end), moder-
ately apply lubricant to the interior surfaces of boom
sections 1, 2, 3, and 4. To prevent misdiagnosis of
hydraulic leaks, take care to prevent excessive applica-
tion of lubrication.
4.
At the rear of the machine, apply lubricant to the side,
top and bottom surfaces of boom sections 5, 4, 3, and 2
specifically to wear pad contact paths. To prevent misdi-
agnosis of hydraulic leaks, take care to prevent excessive
application of lubrication.
5.
After application of the lubricant is complete, cycle the
boom through its full range of travel 2 times.
4.7
BOOM CLEANLINESS GUIDELINES
The following are guidelines for internal boom cleanliness for
machines that are used in excessively dirty environments.
1.
JLG recommends the use of the JLG Hostile Environment
Package if available to keep the internal portions of a
boom cleaner and to help prevent dirt and debris from
entering the boom. This package reduces the amount of
contamination which can enter the boom but does not
eliminate the need for more frequent inspections and
maintenance when used in these types of environ-
ments.
2.
JLG recommends that you follow all guidelines for ser-
vicing your equipment in accordance with the instruc-
tions outlined in the JLG Service & Maintenance Manual
for your machine. Periodic maintenance and inspection
is vital to the proper operation of the machine. The fre-
quency of service and maintenance must be increased
as environment, severity and frequency of usage
requires.
3.
Debris and foreign matter inside of the boom can cause
premature failure of components and should be
removed. Methods to remove debris should always be
done using all applicable safety precautions outlined in
the JLG Service & Maintenance Manuals.
4.
The first attempt to remove debris from inside the boom
must be to utilize pressurized air to blow the debris
toward the nearest exiting point from the boom. Make
sure that all debris is removed before operating the
machine.
5.
If pressurized air cannot dislodge the debris, then water
with mild solvents applied via a pressure washer can be
used. Again the method is to wash the debris toward the
nearest exiting point from the boom. Make sure that all
debris is removed, that no “puddling” of water has
occurred, and that the boom internal components are
dry prior to operating the machine. Make sure you com-
ply with all federal and local laws for disposing of the
wash water and debris.
6.
If neither pressurized air nor washing of the boom dis-
lodges and removes the debris, then disassemble the
boom in accordance to the instructions outlined in the
JLG Service & Maintenance Manual to remove the
debris.
Summary of Contents for 1850SJ
Page 1: ...Service and Maintenance Manual Model 1850SJ 3121619 June 29 2018 Rev J AS NZS...
Page 2: ......
Page 21: ...3121619 xvii LIST OF FIGURES FIGURE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 24: ...xx 3121619 LIST OF TABLES TABLE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 50: ...SECTION 2 GENERAL 2 12 3121619 NOTES...
Page 55: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 5 This page left blank intentionally...
Page 56: ...SECTION 3 CHASSIS TURNTABLE 3 6 3121619 Figure 3 4 Axle Hose Routing Sheet 1 of 2...
Page 57: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 7 Figure 3 5 Axle Hose Routing Sheet 2 of 2...
Page 58: ...SECTION 3 CHASSIS TURNTABLE 3 8 3121619 Figure 3 6 Steering Axle Hydraulic Circuit...
Page 61: ...SECTION 3 CHASSIS TURNTABLE 3121619 3 11 Figure 3 9 Turntable Hydraulic System...
Page 92: ...SECTION 3 CHASSIS TURNTABLE 3 42 3121619 Figure 3 39 Swing Bearing Wear Tolerance...
Page 94: ...SECTION 3 CHASSIS TURNTABLE 3 44 3121619 Figure 3 41 Swing Bearing Removal Sheet 2 of 4...
Page 110: ...SECTION 3 CHASSIS TURNTABLE 3 60 3121619 Figure 3 54 Engine Electrical Circuit...
Page 169: ...SECTION 4 BOOM PLATFORM 3121619 4 7 Figure 4 1 Boom Hydraulic System...
Page 173: ...SECTION 4 BOOM PLATFORM 3121619 4 11 Figure 4 2 Boom Assembly Sheet 1 of 9...
Page 174: ...SECTION 4 BOOM PLATFORM 4 12 3121619 Figure 4 3 Boom Assembly Sheet 2 of 9...
Page 175: ...SECTION 4 BOOM PLATFORM 3121619 4 13 Figure 4 4 Boom Assembly Sheet 3 of 9...
Page 176: ...SECTION 4 BOOM PLATFORM 4 14 3121619 Figure 4 5 Boom Assembly Sheet 4 of 9...
Page 177: ...SECTION 4 BOOM PLATFORM 3121619 4 15 Figure 4 6 Boom Assembly Sheet 5 of 9...
Page 178: ...SECTION 4 BOOM PLATFORM 4 16 3121619 Figure 4 7 Boom Assembly Sheet 6 of 9...
Page 179: ...SECTION 4 BOOM PLATFORM 3121619 4 17 Figure 4 8 Boom Assembly Sheet 7 of 9...
Page 180: ...SECTION 4 BOOM PLATFORM 4 18 3121619 Figure 4 9 Boom Assembly Sheet 8 of 9...
Page 181: ...SECTION 4 BOOM PLATFORM 3121619 4 19 Figure 4 10 Boom Assembly Sheet 9 of 9...
Page 187: ...SECTION 4 BOOM PLATFORM 3121619 4 25 Figure 4 16 Boom Assembly Torque Values Sheet 1 of 4...
Page 188: ...SECTION 4 BOOM PLATFORM 4 26 3121619 Figure 4 17 Boom Assembly Torque Values Sheet 2 of 4...
Page 189: ...SECTION 4 BOOM PLATFORM 3121619 4 27 Figure 4 18 Boom Assembly Torque Values Sheet 3 of 4...
Page 190: ...SECTION 4 BOOM PLATFORM 4 28 3121619 Figure 4 19 Boom Assembly Torque Values Sheet 4 of 4...
Page 201: ...SECTION 4 BOOM PLATFORM 3121619 4 39 Figure 4 20 Hose Adjustment...
Page 202: ...SECTION 4 BOOM PLATFORM 4 40 3121619 Figure 4 21 Section 3 Boom Cables...
Page 203: ...SECTION 4 BOOM PLATFORM 3121619 4 41 Figure 4 22 Section 4 Boom Cables...
Page 204: ...SECTION 4 BOOM PLATFORM 4 42 3121619 Figure 4 23 Section 5 Boom Cables...
Page 205: ...SECTION 4 BOOM PLATFORM 3121619 4 43 Figure 4 24 Jib Hydraulics Sheet 1 of 7...
Page 234: ...SECTION 4 BOOM PLATFORM 4 72 3121619 Figure 4 44 Powertrack Shimming Instructions...
Page 239: ...SECTION 4 BOOM PLATFORM 3121619 4 77 Figure 4 49 Powertrack Hose Installation Sheet 1 of 4...
Page 240: ...SECTION 4 BOOM PLATFORM 4 78 3121619 Figure 4 50 Powertrack Hose Installation Sheet 2 of 4...
Page 241: ...SECTION 4 BOOM PLATFORM 3121619 4 79 Figure 4 51 Powertrack Hose Installation Sheet 3 of 4...
Page 242: ...SECTION 4 BOOM PLATFORM 4 80 3121619 Figure 4 52 Powertrack Hose Installation Sheet 4 of 4...
Page 252: ...SECTION 4 BOOM PLATFORM 4 90 3121619 NOTES...
Page 432: ...SECTION 5 BASIC HYDRAULIC INFORMATION HYDRAULIC SCHEMATICS 5 180 3121619 NOTES...
Page 527: ...SECTION 6 JLG CONTROL SYSTEM 3121619 6 95 Figure 6 36 LSS Installation Sheet 1 of 4...
Page 528: ...SECTION 6 JLG CONTROL SYSTEM 6 96 3121619 Figure 6 37 LSS Installation Sheet 2 of 4...
Page 529: ...SECTION 6 JLG CONTROL SYSTEM 3121619 6 97 Figure 6 38 LSS Installation Sheet 3 of 4...
Page 530: ...SECTION 6 JLG CONTROL SYSTEM 6 98 3121619 Figure 6 39 LSS Installation Sheet 4 of 4...
Page 710: ...SECTION 7 BASIC ELECTRICAL INFORMATION ELECTRICAL SCHEMATICS 7 118 3121619 NOTES...
Page 711: ......